Stabilising dispatch commitments at BURSTER MEASUREMENT SYSTEMS PVT LTD

Stabilising dispatch commitments at BURSTER MEASUREMENT SYSTEMS PVT LTD

Stabilising dispatch commitments at BURSTER MEASUREMENT SYSTEMS PVT LTD

Exceptions started surfacing early, reducing daily firefighting and urgent purchases. when the planner was on leave.

27%

Reduction in rework/rejection loops

27%

Reduction in rework/rejection loops

15 days

Order lead time improvement

15 days

Order lead time improvement

21%

Reduction in emergency purchases

21%

Reduction in emergency purchases

Hero Background

About BURSTER MEASUREMENT SYSTEMS PVT LTD

About BURSTER MEASUREMENT SYSTEMS PVT LTD

BURSTER MEASUREMENT SYSTEMS PVT LTD operates from Kanchipuram and builds custom spares for OEM customers. As a small-scale engineering unit running staggered shifts, they work with a mix of make-to-stock and make-to-order model and two warehouses. They needed a centralised workflow to reduce daily follow-ups and keep commitments predictable.

Workspace Icon

Engineering

Industry

Workspace Icon

Engineering

Industry

Workspace Icon

Engineering

Industry

Workspace Icon

Small

Company Size

Workspace Icon

Small

Company Size

Workspace Icon

Small

Company Size

Workspace Icon

Kanchipuram

Location

Workspace Icon

Kanchipuram

Location

Workspace Icon

Kanchipuram

Location

Workspace Icon

WIP tracking across multiple workcentres with stage ownership

Use Cases

Workspace Icon

WIP tracking across multiple workcentres with stage ownership

Use Cases

Workspace Icon

WIP tracking across multiple workcentres with stage ownership

Use Cases

Challenges

Sub-Assembly status was confirmed via WhatsApp-based follow-ups, so WIP clarity broke during two shifts.

Sub-Assembly status was confirmed via WhatsApp-based follow-ups, so WIP clarity broke during two shifts.

Sub-Assembly status was confirmed via WhatsApp-based follow-ups, so WIP clarity broke during two shifts.

Consumables shortages showed up late, causing emergency buys and delays on sub-assemblies.

Consumables shortages showed up late, causing emergency buys and delays on sub-assemblies.

Consumables shortages showed up late, causing emergency buys and delays on sub-assemblies.

Dispatch dates were cleared before checks for drawing revisions, causing reshuffles (bulk dispatch at month-end). when multiple orders overlapped.

Dispatch dates were cleared before checks for drawing revisions, causing reshuffles (bulk dispatch at month-end). when multiple orders overlapped.

Dispatch dates were cleared before checks for drawing revisions, causing reshuffles (bulk dispatch at month-end). when multiple orders overlapped.

Stage-wise ownership and handovers

Stage-wise ownership and handovers

Stage-wise ownership and handovers

Earlier, BURSTER MEASUREMENT SYSTEMS PVT LTD relied on whiteboard planning and calls to confirm machining progress. When priorities changed, different teams carried different versions of the plan. A centralised workflow captured stage updates at source, so WIP moved with clear ownership. The daily review shifted from collecting updates to resolving exceptions. Supervisors started closing handovers on time, improving predictability during single shift.

Earlier, BURSTER MEASUREMENT SYSTEMS PVT LTD relied on whiteboard planning and calls to confirm machining progress. When priorities changed, different teams carried different versions of the plan. A centralised workflow captured stage updates at source, so WIP moved with clear ownership. The daily review shifted from collecting updates to resolving exceptions. Supervisors started closing handovers on time, improving predictability during single shift.

Earlier, BURSTER MEASUREMENT SYSTEMS PVT LTD relied on whiteboard planning and calls to confirm machining progress. When priorities changed, different teams carried different versions of the plan. A centralised workflow captured stage updates at source, so WIP moved with clear ownership. The daily review shifted from collecting updates to resolving exceptions. Supervisors started closing handovers on time, improving predictability during single shift.

Requirement-driven buying rhythm

Requirement-driven buying rhythm

Requirement-driven buying rhythm

Earlier, buying for bought-outs was triggered after shortages hit the shopfloor. Follow-ups lived in personal reminders, so receipts slipped during busy days. Requirements were linked to live orders and sub-assemblies, creating a daily shortage list. Vendors were followed up against dates, not memory, and approvals became faster. The team reduced emergency purchases and avoided excess on slow movers across two warehouses.

Earlier, buying for bought-outs was triggered after shortages hit the shopfloor. Follow-ups lived in personal reminders, so receipts slipped during busy days. Requirements were linked to live orders and sub-assemblies, creating a daily shortage list. Vendors were followed up against dates, not memory, and approvals became faster. The team reduced emergency purchases and avoided excess on slow movers across two warehouses.

Earlier, buying for bought-outs was triggered after shortages hit the shopfloor. Follow-ups lived in personal reminders, so receipts slipped during busy days. Requirements were linked to live orders and sub-assemblies, creating a daily shortage list. Vendors were followed up against dates, not memory, and approvals became faster. The team reduced emergency purchases and avoided excess on slow movers across two warehouses.

Promise dates with readiness gates

Promise dates with readiness gates

Promise dates with readiness gates

Earlier, dispatch dates were committed before checks on custom job tracking. Packing, QA clearance, and paperwork were tracked in different places. Readiness gates were added so jobs were released only when documents were complete. Customers got clearer dates, and escalations reduced because holds had visible reasons. Dispatch planning became steadier even with a mix of make-to-stock and make-to-order model and project-based customers.

Earlier, dispatch dates were committed before checks on custom job tracking. Packing, QA clearance, and paperwork were tracked in different places. Readiness gates were added so jobs were released only when documents were complete. Customers got clearer dates, and escalations reduced because holds had visible reasons. Dispatch planning became steadier even with a mix of make-to-stock and make-to-order model and project-based customers.

Earlier, dispatch dates were committed before checks on custom job tracking. Packing, QA clearance, and paperwork were tracked in different places. Readiness gates were added so jobs were released only when documents were complete. Customers got clearer dates, and escalations reduced because holds had visible reasons. Dispatch planning became steadier even with a mix of make-to-stock and make-to-order model and project-based customers.

More like this

Bromil Auto Technologies Private Limited

Bromil Auto Technologies Private Limited transformed its operational workflow by implementing a centralized system to streamline assembly progress and improve dispatch reliability. The company faced significant challenges, including unclear WIP visibility during staggered shifts and late identification of coolant shortages, which led to emergency purchases. By enhancing ownership at each stage and linking materials to live orders, they achieved greater predictability in their dispatch commitments and improved overall efficiency. This innovative approach not only refined their processes but also aimed to reduce the pressure on inventory management.

Read More

Automed Material Handling Solutions Private Limited

In a dynamic auto ancillary environment, Automed Material Handling Solutions Private Limited faced operational challenges including fragmented communication, last-minute dispatch changes, and delays due to tool shortages. By implementing a centralized workflow, the company transformed its planning process, creating a unified view that enhanced accountability and streamlined vendor management. This approach not only improved efficiency but also set the stage for more predictable operations across their make-to-order model. The case study delves into how these strategic adjustments reshaped their operational landscape.

Read More

CROSS FLOW INDIA

In a bid to streamline operations, CROSS FLOW INDIA adopted a centralized workflow to enhance visibility and accountability across its manufacturing processes. The company faced challenges such as unclear work-in-progress tracking, late identification of shortages, and premature dispatch commitments that led to inefficiencies. By implementing a structured approach to daily planning and requirement-driven purchasing, they aimed to improve predictability and reduce delays. This transformation not only enhanced operational clarity but also aimed to foster a more responsive and efficient production environment.

Read More

Hero Background
Know your Business
without guesswork.
Just Ask!

Made in India | 100% Data Secure | Built by IIT/IIM Graduates

Hero Background
Run your Factory
Without Firefighting.
Start Today!

Made in India | 100% Data Secure | Built by IIT/IIM Graduates

Hero Background
Run your Factory
Without Firefighting.
Start Today!

Made in India | 100% Data Secure | Built by IIT/IIM Graduates