A gate pass is a numbered slip, approved by a manager and checked by security, for goods or vehicles leaving or entering a factory. A standard gate pass format has the pass number, date and time, and type (returnable or non-returnable). It also has the party, the linked invoice or delivery challan number, the vehicle number, item lines with quantity, and signatures. It is an internal control: it does not replace the GST invoice, delivery challan or e-way bill the movement may need.
What is a gate pass?
A material gate pass is written permission for goods to cross your gate. Stores raises it, a manager signs it, and security checks it at the gate.
Types of gate pass
Gate passes split by direction (inward or outward) and by return. A returnable gate pass (RGP) is for goods that must come back. A non-returnable gate pass (NRGP) is for goods that leave for good.
| Type | When to use it | Fields that become required |
|---|---|---|
| NRGP (outward) | Sale, scrap, transfer to another site | Invoice or challan number, vehicle number, e-way bill number where needed |
| RGP (outward) | Repair, calibration, loan, trial, job work | Purpose, party, challan number, expected return date |
| Inward against an RGP | Your own goods coming back | Original RGP number, quantity, date, condition |
| Inward (new material) | Supplier deliveries | Supplier invoice or challan number, PO number; then a GRN |
| Vehicle pass | Trucks, tempos, visitor vehicles | Vehicle number, driver, time in and out |
What each column in the gate pass format means
The Excel file has 12 columns, one row per item line.
| Column | What to write | Required? |
|---|---|---|
| Pass no. | A serial that never repeats, such as GP/26-27/0412 | Required |
| Date | Date the pass is issued | Required |
| Type | RGP or NRGP, and In or Out | Required |
| Party (purpose) | Who gets the goods, and why: sale, repair, job work, scrap | Required |
| Document no. | Invoice or delivery challan number, plus the e-way bill number if needed | Required for goods leaving |
| Vehicle no. | Truck or tempo number, or "Hand-carried" | Required |
| Item (unit) | Item name or code, with Nos, kg or metres | Required |
| Qty out | Quantity counted at the gate | Required |
| Return by | Date the goods must be back | Required for RGP |
| Qty back | Quantity returned, with the date | RGP only |
| Pending | Qty out minus qty back, and days overdue | RGP only |
| Signed by | Manager's signature; guard's name, time out and "count OK" | Required |
Need it in Word? Use the same fields, with the item lines in a table and two signatures at the bottom.
How to fill a gate pass, step by step
- Raise: stores fills the type, party, purpose, items and quantity, plus the return date for an RGP.
- Approve: the manager signs before the goods reach the gate.
- Link: write the invoice or challan number, and the e-way bill number if there is one.
- Check out: security counts the goods, notes the vehicle and time, and signs. The driver carries a copy.
- Check in and close: security logs returned RGP goods. Stores closes the pass only when the full quantity is back.
[[IMAGE {"type":"checklist","title":"What security checks before goods leave","items":["Signed pass with a unique number","Invoice or challan number on the pass","E-way bill number, where needed","Count matches the pass","Vehicle number and time out","Return date on every RGP"]}]]
Worked example: three gate passes at an auto-parts factory (illustrative numbers)
An auto-parts maker near Pune sends out three loads in one fortnight.
Example: a sale, a repair and a job-work pass
| Pass | Type and purpose | Documents | Items out |
|---|---|---|---|
| GP/26-27/0412, 10 Nov | NRGP: sale to a tractor maker, Nashik | INV/26-27/1187; EWB 3412 0098 7612 | 400 brake drums, 250 hub flanges |
| GP/26-27/0398, 27 Oct | RGP: motor rewinding, Bhosari; due 10 Nov | DC/26-27/0076; no EWB (₹38,000, below ₹50,000) | 1 motor, 7.5 kW |
| GP/26-27/0405, 3 Nov | RGP: zinc plating job work, Chakan; due 17 Nov | DC/26-27/0081; EWB 3412 0101 4588 (₹1,80,000) | 2,000 MB-12 brackets |
Example: RGP register on 25 Nov 2026, what is still outside and overdue
| Pass and item | Out and back | Pending | Status on 25 Nov |
|---|---|---|---|
| GP/26-27/0391, vernier calipers (calibration) | 6 out, 6 back on 29 Oct (due 30 Oct) | 0 | Closed |
| GP/26-27/0398, 7.5 kW motor (rewinding) | 1 out, 0 back (due 10 Nov) | 1 | 15 days overdue |
| GP/26-27/0405, MB-12 brackets (plating) | 2,000 out, 1,500 back on 15 Nov (due 17 Nov) | 500 | 8 days overdue |
That morning, stores calls the rewinding shop and the plater. Sale pass 0412 is an NRGP, so it never appears in this register.
See how your invoices, e-way bills, GRNs and job-work records line up in one place.
Gate pass vs delivery challan vs e-way bill
These three often travel together but do different jobs. The gate pass is your own record; the other two are GST documents.
| Document | What it does | When you need it |
|---|---|---|
| Gate pass | Records that goods crossed your gate, who approved it, and whether they return | Every gate movement. It never replaces a GST document. |
| Delivery challan (Rule 55, CGST Rules) | Goes with goods moved without an invoice | Job work, or moves other than supply. Serially numbered, up to 16 characters. |
| E-way bill | Records the goods movement for GST | Inter-state job work: always, whatever the value. Other moves: usually above ₹50,000. |
Check with your accountant which documents each movement needs. See our delivery challan format and e-way bill format.
Common gate pass mistakes
| Mistake | What goes wrong | Fix |
|---|---|---|
| No return date on an RGP | Nobody knows when the goods are late | Make the date required on every RGP |
| Re-dating an overdue pass | The delay disappears from the register | Keep the first date; note any agreed extension beside it |
| No invoice or challan number | Goods leave without their GST document | Security releases nothing without the number |
| Closing on a partial return | Pending items drop off the list | Close only when the full quantity is back |
| Handwritten numbers that repeat | Two passes share a number | Use pre-printed or system serial numbers |
Sample authorisation letter for a gate pass request
Some sites ask for a letter when someone outside stores collects goods:
To: The Security In-charge, [Factory name]. Date: 3 Nov 2026.
Subject: Authorisation to take out material on RGP GP/26-27/0405
I authorise Mr Sunil Jadhav, driver of MH 14 GH 2290, to collect 2,000 Nos of mounting bracket MB-12. They go to our job worker in Chakan for zinc plating, under challan DC/26-27/0081. They must come back by 17 Nov 2026. Please release them after checking the count against the gate pass.
Signed: [Name], Stores Manager, [Phone]
Where TranZact fills these details for you
Every gate pass points to another record: an invoice, an e-way bill, a GRN or a stock movement. When those sit across Tally, Excel and WhatsApp, stores retypes each number by hand. That is where mismatches start.
TranZact's manufacturing AI software, used by 10,000+ manufacturers, keeps those records in one place:
- E-way bill: generated from the GST invoice, with the e-invoice (IRN) in the same flow, on all plans.
- Dispatch: part of the sales flow, with enquiry, quotation, order timeline, e-invoicing and payment.
- Inward goods: purchase management runs MRP report, indent, RFQ, PO, GRN and payment. See our GRN format too.
- Job work: sub-contracting is part of production management.
- Stock: inventory management covers stock in, issue, transfer, bin card and multi-store. See our material transfer note format.
- Accounts: accounting stays in Tally, with one-way sync and no double entry. Busy and Zoho Books work too.
The honest limit: the gate pass slip itself stays with your security desk. TranZact's live product pages don't list a gate pass or RGP document. What changes is that stores copies each number from one system. Teams go live in 2–3 weeks, with no consultants and no IT team.
TranZact facts (as of 17 Nov 2026)
| Fact | Plan | Source |
|---|---|---|
| E-way bill generated from the GST invoice, with e-invoice (IRN) in the same flow | All plans | TranZact |
| Routing and sub-contracting | Grow, Scale+ and Dominate | letstranzact.ai/pricing |
| Tally, Busy and Zoho Books integration; accounting stays in Tally | Grow, Scale+ and Dominate | letstranzact.ai/pricing |
| Live in 2–3 weeks | — | TranZact |
Don't be the bottleneck. Become the AI-Run Factory.
Your gate register should tell you what is outside and what is late, without a round of phone calls. Bring last month's RGP list to the demo. We'll show where each invoice, e-way bill, GRN and job-work record sits in TranZact.
Born in India. Building for the world.