A job work challan is the delivery challan your goods travel on to a job worker for plating, machining, heat treatment or another process. Under CGST Rules 45 and 55, it must show a serial number of up to 16 characters and the date. It must also show both parties' names, addresses and GSTINs, the HSN code, description, quantity and taxable value. Add the place of supply for inter-state moves, and a signature. No GST is charged, because goods sent for job work are not a supply. But inputs must come back within 1 year and capital goods within 3 years. If not, they are treated as supplied on the day they left.
What a job work challan is and when you need one
Is a delivery challan required for job work? Yes. Rules 45 and 55(1)(b) require a delivery challan instead of an invoice, issued by you, the principal.
Is GST charged on a job work challan? No. Section 143 lets you send inputs and capital goods for job work without paying tax. The challan carries the taxable value, but no tax amount.
Job work challan or tax invoice? A tax invoice is for a sale and charges GST. A job work challan moves your own goods out and back, so ownership never changes. For other challans, see our delivery challan guide.
Job work challan format: every field explained
Fields marked "Rule 55" are required by law. The rest are good practice.
| Field | What to write | Required? |
|---|---|---|
| Copy marker | Original, Duplicate, Triplicate | Rule 55(2) |
| Challan number | One running series, up to 16 characters | Rule 55 |
| Date | The day the goods leave | Rule 55 |
| Principal (consigner) | Your name, address and GSTIN | Rule 55 |
| Job worker (consignee) | Name, address, GSTIN if registered | Rule 55 |
| HSN code | HSN of each item | Rule 55 |
| Description | What the goods are | Rule 55 |
| Quantity and unit | Count in the unit you will check on return | Rule 55 |
| Rate and taxable value | Quantity × rate; no tax amount | Rule 55 (value) |
| Place of supply | Destination state, for inter-state moves | Rule 55 |
| Goods type | Input, capital goods or tool | Good practice |
| Process | The work to be done | Good practice |
| Expected back | Date agreed with the job worker | Good practice |
| Transport and e-way bill | Vehicle, transporter, e-way bill number | Good practice |
| Signature | You or your authorised person | Rule 55 |
Header fields: copy marker, challan number, date
Use one running series per financial year, such as JW/26-27/0001. Never reuse a number, even for a cancelled challan.
Principal (consigner) and job worker (consignee) details
Write both GSTINs in full. For an unregistered job worker, leave the GSTIN blank.
Item table: HSN, quantity, value, goods type, process
If the exact quantity isn't known, Rule 55 allows a provisional figure. Mark each line as input, capital goods or tool.
Transport and e-way bill
Add the vehicle number, transporter and e-way bill number.
Declaration, terms and signatures
Add a line such as "Goods sent for job work under Section 143. Not for sale." Leave space for the job worker to sign for receipt.
How to fill a job work challan in 6 steps
- Take the next number from your challan series.
- Fill the header: date, both parties and the place of supply.
- List each item with HSN, description, quantity, unit, rate and taxable value.
- Mark the goods type, the process and the date you expect it back.
- Add transport details and the e-way bill number where one is needed.
- Sign, print three copies and enter each line in your register.
How many copies of a job work challan are needed? Three, under Rule 55(2). The original goes to the job worker and the duplicate to the transporter. You keep the triplicate.
Can a supplier send goods directly to my job worker? Yes. The supplier bills you, and you issue the job work challan to the job worker. Note the supplier's invoice number on your challan.
Worked example: 3 items sent from Pune to a plater in Gujarat
A Pune engineering unit sends parts for zinc plating to a plater in Vapi, Gujarat. Challan JW/26-27/0047 is dated 12 November 2026. The move is inter-state, so an e-way bill travels with the truck.
| Item | HSN | Qty and type | Taxable value (₹) |
|---|---|---|---|
| MS mounting bracket, machined (₹42 each) | 7326 | 2,000 Nos, input | 84,000 |
| Hex bolt M10 x 40 (₹6.50 each) | 7318 | 5,000 Nos, input | 32,500 |
| Plating fixture (₹3,500 each) | 8466 | 4 Nos, tool | 14,000 |
| Total | 1,30,500 |
GST charged: nil. The brackets and bolts must be back by 11 November 2027. The fixtures are tools, so no deadline applies. All values here are illustrative.
Track what comes back: the job work register
The challan records what left. The register records what came back, what became scrap and what is still out. Keep one line per challan line.
| Challan line | Sent | Back + scrap | Pending |
|---|---|---|---|
| 0047 / Bracket (by 11-Nov-2027) | 2,000 | 1,950 + 20 | 30 |
| 0047 / Bolt (by 11-Nov-2027) | 5,000 | 5,000 + 0 | 0 |
| 0047 / Fixture (no limit) | 4 | 0 + 0 | 4 |
[[IMAGE {"type":"compare","title":"Job work return deadlines by goods type","columns":["Return deadline","If not back in time"],"rows":[["Inputs","1 year from the day sent","Treated as supplied; GST due"],["Capital goods","3 years from the day sent","Treated as supplied; GST due"],["Moulds, dies, jigs, fixtures, tools","No time limit","Deadline rule does not apply"]]}]]
Who is liable if goods are not returned from the job worker in time? You, the principal. Goods not back in time are treated as supplied by you on the day they left. You then owe GST on them.
Your challan numbers also feed ITC-04. Here is how to file ITC-04 from your register.
A register in a shared Excel file needs someone to update it after every return. In TranZact AI, sub-contracting, stock in, issue and multi-store sit on one system.
E-way bill for job work: inter-state vs intra-state
Do you need an e-way bill with a job work challan? For inter-state moves, yes, whatever the value. The proviso to Rule 138 says so.
Within your state, your state's own value limit applies. Check it before you dispatch. See our guide to e-way bill software for manufacturers.
7 common mistakes on job work challans
| Mistake | Fix |
|---|---|
| Charging GST or using a tax invoice | Use a challan with the Section 143 declaration |
| No taxable value | Write the value agreed with your CA |
| Input and capital goods not marked | Mark each line, since deadlines differ |
| Process left blank | Write the process for every line |
| No e-way bill on a small inter-state lot | Inter-state job work needs one at any value |
| Sent in kg, counted back in Nos | Use one unit on the challan and the register |
| Partial returns and scrap not logged | Record each return against the original challan line |
How to make a job work challan in Excel with the free file
The download has two tabs: a blank format and the filled example above.
- Fill the header block first.
- Taxable value is quantity times rate. Check the total before you print.
- Print on A4 landscape, with "Fit All Columns on One Page" switched on.
- To track returns, copy each line to a new tab and add Qty back, Scrap and Pending.
When Excel stops working: where TranZact fits
Excel breaks once you have several job workers, partial returns and scrap at once. Every update depends on someone remembering it.
TranZact is manufacturing AI software used by 10,000+ manufacturers. In TranZact AI, sub-contracting sits in production next to multi-level BOM, work orders and process routing. Inventory covers stock in, issue, bin card and multi-store.
A photo of a paper entry becomes a system entry, with no typing. Accounts stay in Tally, with a one-way sync and no double entry. TranZact goes live in 2–3 weeks.
Routing and sub-contracting are included from the Grow plan, at ₹8,333/month billed yearly for 4 users. Custom document formats are on the Dominate plan. See pricing for every plan.
For the BOM side, see our bill of materials format. For the full process, read our subcontracting guide.
Honest limits. TranZact does not file ITC-04; that stays with you or your CA. TranZact generates the e-way bill from the GST invoice, with e-invoice (IRN) in the same flow. Ask to see your own job work flow during the demo.
Don't be the bottleneck. Become the AI-Run Factory.
Born in India. Building for the world.