What is a quotation format?
A quotation is the price offer you send after a buyer's enquiry or RFQ, before their purchase order. Once the buyer accepts, use our sales order format. An estimate is a rough figure; a quotation is a firm price for a fixed time.
What a quotation format must include
- Header: both parties' name, address and GSTIN; quote number, revision, date, validity and enquiry reference.
- Item table: code, description, HSN, quantity, unit, rate, discount, taxable value, GST and lead time.
- Totals: taxable value, GST, packing and freight, grand total in figures and words.
- Terms: price basis (Ex-works or FOR), payment, delivery, validity, raw-material clause and signature.
Every column explained
| Field | What to write | Example | Why it matters |
|---|---|---|---|
| Item code / drawing no. (Rev) | Part code and drawing revision | SH-2040 Rev B | Stops quoting an old drawing. |
| Description | Part name, material, finish | Drive shaft, EN8 | Checked against their spec. |
| HSN | The goods' HSN code | 8483 | Must match the tax invoice. |
| Qty and unit | Quantity and unit | 200 Nos | A rate means nothing without the unit. |
| Rate (₹) | Price per unit, without GST | 450.00 | Buyers compare pre-tax rates. |
| Disc % | Discount on this line | 5% | Taken before tax. |
| Taxable value (₹) | Qty × rate, less discount | 85,500.00 | GST is worked out on this. |
| GST % | Rate for this HSN | 18% | Items can carry different rates. |
| CGST / SGST / IGST (₹) | Tax in the right columns | 7,695 + 7,695 | Wrong type means a corrected invoice. |
| Lead time | Delivery time for this line | 3 weeks | Lines often differ. |
CGST + SGST or IGST?
A quotation does not charge GST. It shows the GST the buyer will pay on the invoice. Place of supply decides the type.
- Same state: CGST + SGST, half each. 18% becomes 9% + 9%.
- Another state: IGST at the full 18%.
HSN code on a quotation
HSN is not required on a quotation, but it is on the tax invoice. Use the same code on both: see our GST invoice format.
How to fill the quotation format, step by step
- Read the enquiry and drawing. Costing from a parts list? Use our bill of materials format.
- Give a quote number. New quotes start at Rev 0.
- Enter the buyer and place of supply. Copy the GSTIN exactly.
- Add item lines with HSN, quantity, unit, rate and lead time.
- Apply discount before tax.
- Add packing and freight per your price basis, at the goods' GST rate.
- Check the totals. Taxable value plus GST must equal the grand total.
- Add terms and signature, then send as a PDF.
Worked example: a Pune engineering firm quotes a Nashik buyer
The numbers are illustrative. Both firms are in Maharashtra, so GST is CGST 9% + SGST 9%. Terms: Ex-works Pune, 30 days from invoice, valid 15 days.
| Line | Maths | Taxable value (₹) | CGST + SGST (₹) |
|---|---|---|---|
| Drive shaft SH-2040 Rev B | 200 × 450 = 90,000, less 5% (4,500) | 85,500 | 7,695 + 7,695 |
| Bearing housing BH-1120 Rev A | 100 × 780 | 78,000 | 7,020 + 7,020 |
| Hex bolt M12 × 50 | 1,000 × 12.50 | 12,500 | 1,125 + 1,125 |
| Packing and forwarding | Flat charge | 3,500 | 315 + 315 |
| Total | 1,79,500 | 16,155 + 16,155 |
GST = ₹32,310. Grand total = 1,79,500 + 32,310 = ₹2,11,810. For a buyer in Gujarat, it becomes IGST 18%, also ₹32,310.
[[IMAGE {"type":"steps","title":"From enquiry to dispatch: the paper trail","items":["Buyer sends an enquiry or RFQ","You send the quotation, Rev 0","Buyer accepts with a purchase order","Proforma invoice if an advance is due","Tax invoice and e-way bill at dispatch"]}]]
When Excel stops working
Excel is fine for a few quotes a month. It breaks when you send many quotes a week.
- Follow-ups get lost because nobody knows which quotes are open.
- The same details are retyped into the order, the invoice and the e-way bill.
- Team members work from different versions of the file.
Where the quotation fits in TranZact
TranZact is manufacturing AI software used by 10,000+ manufacturers. The quotation sits inside one sales flow: enquiry, quotation, order timeline, dispatch, e-invoicing and payment.
TranZact generates the e-way bill from the GST invoice, with the e-invoice (IRN) in the same flow, on all plans. Accounting stays in Tally, Busy or Zoho Books, with one-way sync and no double entry.
Custom document formats, for your own quotation layout, are on the Dominate plan (see pricing). TranZact goes live in 2–3 weeks.
Quotation validity and revisions
15 or 30 days is common. Keep it short when steel or copper prices move.
Yes, you can revise a sent quote. Keep the number and raise the revision: Rev 0, Rev 1, Rev 2.
Is a quotation legally binding?
A quotation is an offer. It becomes a contract once the buyer accepts it on its terms, usually with a PO. If the PO changes your terms, confirm in writing before production. This is general guidance, not legal advice.
Quotation vs proforma invoice vs tax invoice
| Point | Quotation | Proforma invoice | Tax invoice |
|---|---|---|---|
| Purpose | Offer price and terms | Confirm the order or ask for advance | Bill for goods supplied |
| When sent | After enquiry, before PO | After order, before supply | At or before dispatch |
| Asks for payment? | No | Yes, often an advance | Yes |
| GST effect | None | None, not a tax document | GST due; buyer claims credit |
| Can it change? | Yes, by revision | Yes | Only by credit or debit note |
Next document? Use our proforma invoice format.
Common mistakes that cost orders or margin
- No price basis: freight becomes a fight.
- No validity date: old prices come back months later.
- Wrong tax type: forces a corrected invoice.
- Discount after GST: tax must be on the discounted value.
- No drawing revision: you quote Rev A, they want Rev B.
- Hidden extras: packing or freight appears only on the invoice.
- Totals that don't add up: the buyer questions every number.
- Titled "Tax Invoice": always title it "Quotation".
Don't be the bottleneck. Become the AI-Run Factory.
Download the format and send today's quote. When quotes pile up, see the whole flow from enquiry to dispatch in one call.