What is a request for quotation?
A request for quotation is a short document a buyer sends to several vendors. It asks each vendor to price the same items on the same terms.
A factory sends one for a new item, a new vendor, a price revision or a large order.
The RFQ is what you send. The quotation is the vendor's reply. Here, the vendor fills the reply columns on your own sheet.
| Document | Purpose | What you send | What comes back |
|---|---|---|---|
| RFI (request for information) | Learn what vendors can supply | Questions on capability and certifications | Company details and capabilities |
| RFP (request for proposal) | Get a solution for a loosely defined need | The problem and how you will judge | A proposal with approach and price |
| RFQ (request for quotation) | Get prices for an exactly defined need | Item, spec, quantity, unit and terms | Rates, GST, freight, delivery and validity |
Raw material and bought-out parts with a fixed specification are RFQ buys.
What each part of the RFQ format means
You fill the header, the first six item columns and the terms. The vendor fills the rest.
Header block
| Field | What to enter | Why it matters |
|---|---|---|
| RFQ number and date | A running number, such as RFQ/2026/014, and the send date | The vendor quotes it back; your PO refers to it |
| Buyer name, address and GSTIN | Your registered details | The vendor needs it for the right GST |
| Delivery address | The plant or store receiving the goods | Freight depends on it |
| Contact | Buyer's name, phone and email | Vendors ask questions before quoting |
| Vendor name | One vendor per copy of the file | Ties each reply to one vendor |
Item table: columns you fill
| Column | What to enter | Why it matters |
|---|---|---|
| Sr. No. | 1, 2, 3… | Quick reference to a line |
| Item | Plain name, such as MS sheet | Tells the material family |
| Specification | Grade, standard, size, thickness; drawing no. and revision for made parts | Vendors quote the same thing only with an exact spec |
| Qty | The quantity you need | Rates change with quantity |
| Unit | Nos, kg, metre or litre | Stops quotes in different units |
| Required by | Date material must reach your plant | A cheap but late quote can stop production |
Item table: columns the vendor fills
| Column | What the vendor enters | Why it matters |
|---|---|---|
| HSN code | The item's HSN code | Confirms the GST rate |
| Unit rate (₹, excl. GST) | Price per unit | Rates without GST compare cleanly |
| Amount (₹) | Qty × unit rate | Line total for landed cost |
| GST % | The GST rate charged | Shows a different rate at once |
| Delivery date offered | When they can deliver | Check against your required-by date |
| Vendor remarks | Make, test certificate, minimum order, exceptions | Exceptions often hide here |
Footer
| Field | What to enter | Why it matters |
|---|---|---|
| Price basis | Vendor states ex-works or delivered | Ex-works leaves freight out |
| Freight and packing (₹) | Vendor's figure, if not included | Needed for the landed total |
| Payment terms | Your terms, such as 30 days from receipt | Vendors price credit into the rate |
| Quote deadline | Date the quote must reach you | Late replies don't hold up the PO |
| Quote validity | How long the price holds, such as 30 days | The rate still holds at PO time |
| Notes | Test certificates, packing, inspection | Every vendor prices the same conditions |
[[IMAGE {"type":"compare","title":"Comparing quotes: unit rate vs landed cost","columns":["By unit rate","By landed cost"],"rows":[["Freight and packing","Left out","Added to each total"],["GST","Mixed into some rates","Kept out of every rate"],["Delivery date","Not checked","Checked against required-by date"],["Ex-works quote","Looks cheapest","Shows its true cost"]]}]]
Where the RFQ sits in your purchase flow
An RFQ sits in a chain: MRP report → indent → RFQ → PO → GRN → payment.
What you ask quotes for comes from your orders and BOMs. Start with a clean bill of materials format.
Once you pick a vendor, raise a purchase order on the agreed rate and terms. Check arriving material against the PO with a goods received note.
Where TranZact fits (as of 18 Nov 2026)
TranZact is manufacturing AI software used by 10,000+ manufacturers. In TranZact, purchase runs as this same flow: MRP report → indent → RFQ → PO → GRN → payment.
The MRP engine runs through your orders and BOMs, then tells you what to buy and when.
Accounting stays in Tally. Operations run in TranZact, with a one-way sync and no double entry.
Choosing the vendor stays with your purchase team. Teams go live in 2–3 weeks. See the purchase management page, and plan contents on the pricing page.
How to fill the RFQ format, step by step
- Give it a number and date. Use a running series.
- Copy items and quantities from your indent or shortage list. Don't retype from memory.
- Write the full specification. Add the drawing number and revision for made parts.
- Use one unit per item, the same for every vendor.
- Ask for the price basis and GST separately. Freight and packing come as their own figure.
- Set a required-by date and a separate quote deadline. One is for the material, the other for the reply.
- Send the same file to 3–6 vendors. Change only the vendor name.
- Put the replies side by side. Add freight and packing to each total, then check delivery dates.
Sample email to send with the RFQ
Subject: RFQ/2026/014: MS sheet, square tube and round bar
Dear Sir/Madam,
Please quote for the items in the attached RFQ (Excel). Fill the vendor columns, and state ex-works or delivered, freight, GST % and quote validity.
We need delivery at our plant by 15 Dec 2026. Please send your quote by 28 Nov 2026.
Regards,
[Name], Purchase, [Company], [Phone]
Worked example: steel for an order of 50 trolleys (illustrative)
ABC Engineering (an example company) needs sheet, tube and bar for 50 material-handling trolleys. All numbers are illustrative.
Table 1 (Example): the header
| Field | Example entry |
|---|---|
| RFQ number and date | RFQ/2026/014, 24 Nov 2026 |
| Price basis | Vendor to state ex-works or delivered |
| Payment terms | 30 days from receipt |
| Quote deadline and validity | 28 Nov 2026, valid 30 days |
| Notes | Mill test certificate with each lot |
Table 2 (Example): the items as sent
| Sr. | Item and specification | Qty and unit | Required by |
|---|---|---|---|
| 1 | MS sheet, IS 2062 E250, 2 mm, 1250 × 2500 mm | 40 Nos | 15 Dec 2026 |
| 2 | MS square tube, IS 4923, 25 × 25 × 2 mm, 6 m length | 120 Nos | 15 Dec 2026 |
| 3 | MS round bar for axles, IS 2062 E250, 20 mm dia | 150 kg | 15 Dec 2026 |
Table 3 (Example): three replies compared on landed cost
| Vendor | Material + freight and packing | Landed total (excl. GST) | Delivery offered |
|---|---|---|---|
| Vendor A (delivered) | ₹2,03,000 + ₹0 | ₹2,03,000 | 12 Dec: on time |
| Vendor B (ex-works) | ₹1,96,300 + ₹11,000 | ₹2,07,300 | 22 Dec: late |
| Vendor C (delivered) | ₹2,06,500 + ₹0 | ₹2,06,500 | 15 Dec: on time |
Vendor B has the lowest unit rate on every line: ₹2,800, ₹620 and ₹66, against A's ₹2,900, ₹640 and ₹68. But B quotes ex-works, and freight and packing add ₹11,000.
That makes B's landed total the highest, and its 22 Dec date misses the 15 Dec need. Vendor A is cheapest landed and on time, so A wins.
All three charge 18% GST, so leaving GST out keeps the comparison fair.
Common RFQ mistakes
- Quantity with no unit. One vendor quotes per kg, another per sheet.
- Vague specification. "MS sheet" with no grade or thickness brings quotes for different materials.
- No drawing revision. The vendor quotes an old drawing.
- Not asking ex-works or delivered. Freight stays hidden until the invoice.
- Not asking if GST is included. The cheaper rate can look dearer.
- No quote deadline, or mixing it with the delivery date. The PO waits.
- Different details to different vendors. The replies don't line up.
- Comparing unit rates, not landed totals. The example above shows where that leads.
- No quote validity. The vendor revises the price at PO time.