AKSHAR ENGINEERING WORKS
AKSHAR ENGINEERING WORKS
AKSHAR ENGINEERING WORKS
Connecting materials to live orders at AKSHAR ENGINEERING WORKS

Connecting materials to live orders at AKSHAR ENGINEERING WORKS

Connecting materials to live orders at AKSHAR ENGINEERING WORKS

Planning became steadier once orders, materials, and dispatch checks were linked. during vendor delays.

₹19 L/yr

Annual savings from avoided expediting

₹19 L/yr

Annual savings from avoided expediting

20%

Reduction in inventory mismatch cases

20%

Reduction in inventory mismatch cases

8 days

Order lead time improvement

8 days

Order lead time improvement

Hero Background

About AKSHAR ENGINEERING WORKS

About AKSHAR ENGINEERING WORKS

AKSHAR ENGINEERING WORKS operates from Vadodara and builds fixtures for distributors. As a micro-scale engineering unit running two shifts, they work with a make-to-order model and separate RM and FG stores. They needed a centralised workflow to reduce daily follow-ups and keep commitments predictable.

Workspace Icon

Engineering

Industry

Workspace Icon

Engineering

Industry

Workspace Icon

Micro

Company Size

Workspace Icon

Micro

Company Size

Workspace Icon

Vadodara

Location

Workspace Icon

Vadodara

Location

Workspace Icon

Purchase planning for critical bought-outs linked to job schedules

Use Cases

Workspace Icon

Purchase planning for critical bought-outs linked to job schedules

Use Cases

Challenges

Packing status was reconciled via Excel-based plan, so WIP clarity broke during staggered shifts.

Castings shortages showed up late, causing emergency buys and delays on sub-assemblies.

Dispatch dates were dispatched before checks for drawing revisions, causing reshuffles (vendor billing cut-off rush).

Workcentre progress captured at source when multiple orders overlapped.

Workcentre progress captured at source when multiple orders overlapped.

Workcentre progress captured at source when multiple orders overlapped.

Earlier, AKSHAR ENGINEERING WORKS relied on planner’s notebook and calls to confirm fitment progress. When priorities changed, different teams carried different versions of the plan. A centralised workflow captured stage updates at source, so WIP moved with clear ownership. The daily review shifted from collecting updates to resolving exceptions. Supervisors started closing handovers on time, improving predictability during single shift.

Earlier, AKSHAR ENGINEERING WORKS relied on planner’s notebook and calls to confirm fitment progress. When priorities changed, different teams carried different versions of the plan. A centralised workflow captured stage updates at source, so WIP moved with clear ownership. The daily review shifted from collecting updates to resolving exceptions. Supervisors started closing handovers on time, improving predictability during single shift.

Shortage list with vendor dates around month-end dispatches.

Shortage list with vendor dates around month-end dispatches.

Shortage list with vendor dates around month-end dispatches.

Earlier, buying for tools was triggered after shortages hit the shopfloor. Follow-ups lived in personal reminders, so receipts slipped during busy days. Requirements were linked to live orders and sub-assemblies, creating a daily shortage list. Vendors were followed up against dates, not memory, and approvals became faster. The team reduced emergency purchases and avoided excess on slow movers across single stores.

Earlier, buying for tools was triggered after shortages hit the shopfloor. Follow-ups lived in personal reminders, so receipts slipped during busy days. Requirements were linked to live orders and sub-assemblies, creating a daily shortage list. Vendors were followed up against dates, not memory, and approvals became faster. The team reduced emergency purchases and avoided excess on slow movers across single stores.

Promise dates with readiness gates when the planner was on leave.

Promise dates with readiness gates when the planner was on leave.

Promise dates with readiness gates when the planner was on leave.

Earlier, dispatch dates were committed before checks on promise-date accuracy. Packing, QA clearance, and paperwork were tracked in different places. Readiness gates were added so jobs were released only when documents were complete. Customers got clearer dates, and escalations reduced because holds had visible reasons. Dispatch planning became steadier even with a make-to-order model and export buyers.

Earlier, dispatch dates were committed before checks on promise-date accuracy. Packing, QA clearance, and paperwork were tracked in different places. Readiness gates were added so jobs were released only when documents were complete. Customers got clearer dates, and escalations reduced because holds had visible reasons. Dispatch planning became steadier even with a make-to-order model and export buyers.

More like this

Numakers Asia LLP

Numakers Asia LLP, a small packaging manufacturer in Surat, faced significant operational challenges, including miscommunication on vendor commitments and a lack of synchronization between dispatch processes. To address these issues, they implemented a centralized workflow that streamlined coordination across departments. This transformation led to improved execution predictability and reduced reliance on individual team members for updates. Discover how this approach not only stabilized their planning but also enhanced their overall operational efficiency.

Read More

Hira packaging solutions

Hira Packaging Solutions implemented a centralized workflow to tackle significant operational challenges, such as unclear work-in-progress quantities and disjointed communication across departments. This approach transformed their order-to-dispatch processes, leading to improved execution predictability and streamlined reporting. The team transitioned from reliance on scattered tools and outdated methods to a cohesive system, enhancing accountability and reducing the frequency of escalations. Discover how these strategic changes reshaped their daily operations and outcomes.

Read More

Omkar Industries

In a bid to enhance operational efficiency, Omkar Industries adopted a centralized workflow solution to tackle persistent coordination challenges. The company faced issues with inconsistent inventory tracking, conflicting reports from different systems, and difficulty in managing vendor follow-ups. By streamlining these processes, they aimed for smoother inter-departmental handovers and improved execution predictability, setting the stage for a more cohesive work environment.

Read More

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders