Creating a single source of truth for ANAWIL WIRE AND ENGINEERING LIMITED

Creating a single source of truth for ANAWIL WIRE AND ENGINEERING LIMITED

Creating a single source of truth for ANAWIL WIRE AND ENGINEERING LIMITED

The team moved from ad-hoc tracking to one live view of WIP, shortages, and readiness. during vendor delays.

28%

Reduction in inventory mismatch cases

28%

Reduction in inventory mismatch cases

9 days

Faster internal approvals cycle

9 days

Faster internal approvals cycle

44%

Faster month-end reconciliation

44%

Faster month-end reconciliation

Hero Background

About ANAWIL WIRE AND ENGINEERING LIMITED

About ANAWIL WIRE AND ENGINEERING LIMITED

ANAWIL WIRE AND ENGINEERING LIMITED operates from Koppal and builds LED fixtures for OEM customers. As a medium-scale electrical unit running staggered shifts, they work with a make-to-stock model and separate RM and FG stores. They needed a centralised workflow to reduce daily follow-ups and keep commitments predictable.

Workspace Icon

Electrical

Industry

Workspace Icon

Electrical

Industry

Workspace Icon

Medium

Company Size

Workspace Icon

Medium

Company Size

Workspace Icon

Koppal

Location

Workspace Icon

Koppal

Location

Workspace Icon

Assembly tracking with kitting control and testing readiness

Use Cases

Workspace Icon

Assembly tracking with kitting control and testing readiness

Use Cases

Challenges

Testing status was shared via Excel-based plan, so WIP clarity broke during two shifts. when multiple orders overlapped.

Bought-Outs shortages showed up late, causing emergency buys and delays on LED fixtures.

Dispatch dates were dispatched before checks for revision changes, causing reshuffles (bulk dispatch at month-end).

Stage-wise ownership and handovers around month-end dispatches.

Stage-wise ownership and handovers around month-end dispatches.

Stage-wise ownership and handovers around month-end dispatches.

Earlier, ANAWIL WIRE AND ENGINEERING LIMITED relied on whiteboard planning and calls to confirm labeling progress. When priorities changed, different teams carried different versions of the plan. A centralised workflow captured stage updates at source, so WIP moved with clear ownership. The daily review shifted from collecting updates to resolving exceptions. Supervisors started closing handovers on time, improving predictability during single shift.

Earlier, ANAWIL WIRE AND ENGINEERING LIMITED relied on whiteboard planning and calls to confirm labeling progress. When priorities changed, different teams carried different versions of the plan. A centralised workflow captured stage updates at source, so WIP moved with clear ownership. The daily review shifted from collecting updates to resolving exceptions. Supervisors started closing handovers on time, improving predictability during single shift.

Purchase follow-ups with clarity when the planner was on leave.

Purchase follow-ups with clarity when the planner was on leave.

Purchase follow-ups with clarity when the planner was on leave.

Earlier, buying for busbars was triggered after shortages hit the shopfloor. Follow-ups lived in personal reminders, so receipts slipped during busy days. Requirements were linked to live orders and battery packs, creating a daily shortage list. Vendors were followed up against dates, not memory, and approvals became faster. The team reduced emergency purchases and avoided excess on slow movers across single stores.

Earlier, buying for busbars was triggered after shortages hit the shopfloor. Follow-ups lived in personal reminders, so receipts slipped during busy days. Requirements were linked to live orders and battery packs, creating a daily shortage list. Vendors were followed up against dates, not memory, and approvals became faster. The team reduced emergency purchases and avoided excess on slow movers across single stores.

Promise dates with readiness gates when multiple orders overlapped.

Promise dates with readiness gates when multiple orders overlapped.

Promise dates with readiness gates when multiple orders overlapped.

Earlier, dispatch dates were committed before checks on dispatch documentation. Packing, QA clearance, and paperwork were tracked in different places. Readiness gates were added so jobs were released only when documents were complete. Customers got clearer dates, and escalations reduced because holds had visible reasons. Dispatch planning became steadier even with a make-to-order model and distributors. around month-end dispatches.

Earlier, dispatch dates were committed before checks on dispatch documentation. Packing, QA clearance, and paperwork were tracked in different places. Readiness gates were added so jobs were released only when documents were complete. Customers got clearer dates, and escalations reduced because holds had visible reasons. Dispatch planning became steadier even with a make-to-order model and distributors. around month-end dispatches.

More like this

Numakers Asia LLP

Numakers Asia LLP, a small packaging manufacturer in Surat, faced significant operational challenges, including miscommunication on vendor commitments and a lack of synchronization between dispatch processes. To address these issues, they implemented a centralized workflow that streamlined coordination across departments. This transformation led to improved execution predictability and reduced reliance on individual team members for updates. Discover how this approach not only stabilized their planning but also enhanced their overall operational efficiency.

Read More

Hira packaging solutions

Hira Packaging Solutions implemented a centralized workflow to tackle significant operational challenges, such as unclear work-in-progress quantities and disjointed communication across departments. This approach transformed their order-to-dispatch processes, leading to improved execution predictability and streamlined reporting. The team transitioned from reliance on scattered tools and outdated methods to a cohesive system, enhancing accountability and reducing the frequency of escalations. Discover how these strategic changes reshaped their daily operations and outcomes.

Read More

Omkar Industries

In a bid to enhance operational efficiency, Omkar Industries adopted a centralized workflow solution to tackle persistent coordination challenges. The company faced issues with inconsistent inventory tracking, conflicting reports from different systems, and difficulty in managing vendor follow-ups. By streamlining these processes, they aimed for smoother inter-departmental handovers and improved execution predictability, setting the stage for a more cohesive work environment.

Read More

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders