Bringing order-wise control to CANNER ELECTRIC CONNECTIONS

Bringing order-wise control to CANNER ELECTRIC CONNECTIONS

Bringing order-wise control to CANNER ELECTRIC CONNECTIONS

Exceptions started surfacing early, reducing daily firefighting and urgent purchases. (case 769)

46%

Time saved in daily follow-ups

46%

Time saved in daily follow-ups

17%

Reduction in emergency purchases

17%

Reduction in emergency purchases

₹23 L/yr

Working capital freed from slow-movers

₹23 L/yr

Working capital freed from slow-movers

Hero Background

About CANNER ELECTRIC CONNECTIONS

About CANNER ELECTRIC CONNECTIONS

CANNER ELECTRIC CONNECTIONS operates from New Delhi and builds wiring harnesses for OEM customers. As a micro-scale electrical unit running two shifts, they work with a make-to-stock model and single stores. They needed a centralised workflow to reduce daily follow-ups and keep commitments predictable.

Workspace Icon

Electrical

Industry

Workspace Icon

Electrical

Industry

Workspace Icon

Micro

Company Size

Workspace Icon

Micro

Company Size

Workspace Icon

New Delhi

Location

Workspace Icon

New Delhi

Location

Workspace Icon

Assembly tracking with kitting control and testing readiness

Use Cases

Workspace Icon

Assembly tracking with kitting control and testing readiness

Use Cases

Challenges

Testing status was shared via WhatsApp-based follow-ups, so WIP clarity broke during two shifts.

Switchgear shortages showed up late, causing emergency buys and delays on switchboard parts.

Dispatch dates were committed before checks for testing holds, causing reshuffles (bulk dispatch at month-end).

WIP visibility without chasing

WIP visibility without chasing

WIP visibility without chasing

Earlier, CANNER ELECTRIC CONNECTIONS relied on Excel-based plan and calls to confirm wiring progress. When priorities changed, different teams carried different versions of the plan. A centralised workflow captured stage updates at source, so WIP moved with clear ownership. The daily review shifted from collecting updates to resolving exceptions. Supervisors started closing handovers on time, improving predictability during staggered shifts.

Earlier, CANNER ELECTRIC CONNECTIONS relied on Excel-based plan and calls to confirm wiring progress. When priorities changed, different teams carried different versions of the plan. A centralised workflow captured stage updates at source, so WIP moved with clear ownership. The daily review shifted from collecting updates to resolving exceptions. Supervisors started closing handovers on time, improving predictability during staggered shifts.

Materials linked to live orders

Materials linked to live orders

Materials linked to live orders

Earlier, buying for lugs was triggered after shortages hit the shopfloor. Follow-ups lived in personal reminders, so receipts slipped during busy days. Requirements were linked to live orders and transformer parts, creating a daily shortage list. Vendors were followed up against dates, not memory, and approvals became faster. The team reduced emergency purchases and avoided excess on slow movers across two warehouses.

Earlier, buying for lugs was triggered after shortages hit the shopfloor. Follow-ups lived in personal reminders, so receipts slipped during busy days. Requirements were linked to live orders and transformer parts, creating a daily shortage list. Vendors were followed up against dates, not memory, and approvals became faster. The team reduced emergency purchases and avoided excess on slow movers across two warehouses.

Promise dates with readiness gates

Promise dates with readiness gates

Promise dates with readiness gates

Earlier, dispatch dates were committed before checks on testing holds. Packing, QA clearance, and paperwork were tracked in different places. Readiness gates were added so jobs were released only when documents were complete. Customers got clearer dates, and escalations reduced because holds had visible reasons. Dispatch planning became steadier even with a mix of make-to-stock and make-to-order model and OEM customers.

Earlier, dispatch dates were committed before checks on testing holds. Packing, QA clearance, and paperwork were tracked in different places. Readiness gates were added so jobs were released only when documents were complete. Customers got clearer dates, and escalations reduced because holds had visible reasons. Dispatch planning became steadier even with a mix of make-to-stock and make-to-order model and OEM customers.

More like this

Numakers Asia LLP

Numakers Asia LLP, a small packaging manufacturer in Surat, faced significant operational challenges, including miscommunication on vendor commitments and a lack of synchronization between dispatch processes. To address these issues, they implemented a centralized workflow that streamlined coordination across departments. This transformation led to improved execution predictability and reduced reliance on individual team members for updates. Discover how this approach not only stabilized their planning but also enhanced their overall operational efficiency.

Read More

Hira packaging solutions

Hira Packaging Solutions implemented a centralized workflow to tackle significant operational challenges, such as unclear work-in-progress quantities and disjointed communication across departments. This approach transformed their order-to-dispatch processes, leading to improved execution predictability and streamlined reporting. The team transitioned from reliance on scattered tools and outdated methods to a cohesive system, enhancing accountability and reducing the frequency of escalations. Discover how these strategic changes reshaped their daily operations and outcomes.

Read More

Omkar Industries

In a bid to enhance operational efficiency, Omkar Industries adopted a centralized workflow solution to tackle persistent coordination challenges. The company faced issues with inconsistent inventory tracking, conflicting reports from different systems, and difficulty in managing vendor follow-ups. By streamlining these processes, they aimed for smoother inter-departmental handovers and improved execution predictability, setting the stage for a more cohesive work environment.

Read More

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders