Turning daily follow-ups into a repeatable workflow across departments.

5→1 days

Improvement in order-to-dispatch lead time for chemicals work

5→1 days

Improvement in order-to-dispatch lead time for chemicals work

34%

Reduction in excess inventory across store and production

34%

Reduction in excess inventory across store and production

₹7L/yr

Avoided expedite, rework and unplanned purchase costs with fewer last-minute follow-ups

₹7L/yr

Avoided expedite, rework and unplanned purchase costs with fewer last-minute follow-ups

Hero Background

Inside Creative Eyeglasses Pvt Ltd

Inside Creative Eyeglasses Pvt Ltd

Creative Eyeglasses Pvt Ltd is a small chemicals manufacturing unit based in Vadodara. Their day-to-day work involves coordinating orders, material availability, production execution and dispatch commitments. Earlier, updates were shared through a mix of Excel sheets, calls and WhatsApp, which made it hard to keep everyone aligned. By moving to a centralised workflow, the team standardised handovers, reduced rework in reporting, and improved execution predictability.

Workspace Icon

Chemicals

Industry

Workspace Icon

Chemicals

Industry

Workspace Icon

Small

Company Size

Workspace Icon

Small

Company Size

Workspace Icon

Vadodara, India

Location

Workspace Icon

Vadodara, India

Location

Workspace Icon

Batch production + lot traceability + QC holds

Use Cases

Workspace Icon

Batch production + lot traceability + QC holds

Use Cases

Challenges

Short/excess at dispatch led to urgent rework and multiple trips between store and floor.

Vendor committed dates were verbal; delays were discovered only after repeated calls.

Store stock looked fine on paper but production bins were empty when job cards started.

After: Predictable execution, fewer escalations

After: Predictable execution, fewer escalations

After: Predictable execution, fewer escalations

Earlier, dispatch readiness depended on people coordinating invoice, packing and transporter on calls. This broke down when transporter slots moved; finished goods were ready but paperwork and packing lagged behind. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. Dispatch checklists were run a day ahead so invoicing, packing and transporter booking stayed aligned. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Earlier, dispatch readiness depended on people coordinating invoice, packing and transporter on calls. This broke down when transporter slots moved; finished goods were ready but paperwork and packing lagged behind. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. Dispatch checklists were run a day ahead so invoicing, packing and transporter booking stayed aligned. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Before: Too many moving parts, no single view

Before: Too many moving parts, no single view

Before: Too many moving parts, no single view

Earlier, vendor follow-ups were call-driven and depended on whoever remembered to push. This broke down during peak load—approvals got delayed and committed dates slipped without a simple exception view. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. The purchase team used one follow-up queue, logged committed dates, and escalated exceptions early. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Earlier, vendor follow-ups were call-driven and depended on whoever remembered to push. This broke down during peak load—approvals got delayed and committed dates slipped without a simple exception view. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. The purchase team used one follow-up queue, logged committed dates, and escalated exceptions early. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Controlling rework through traceability and holds

Controlling rework through traceability and holds

Controlling rework through traceability and holds

Earlier, store stock, WIP and finished goods were tracked in separate sheets and message threads. This broke down whenever priorities changed—material looked available, but the line stalled due to bin-level shortages. We implemented structured stage-wise tracking and checklists so work moved forward only when prerequisites were met. Supervisors started reviewing shortages at shift start and raised purchase/transfer requests before the line was blocked. The practical outcome was smoother handovers between departments and more predictable daily execution.

Earlier, store stock, WIP and finished goods were tracked in separate sheets and message threads. This broke down whenever priorities changed—material looked available, but the line stalled due to bin-level shortages. We implemented structured stage-wise tracking and checklists so work moved forward only when prerequisites were met. Supervisors started reviewing shortages at shift start and raised purchase/transfer requests before the line was blocked. The practical outcome was smoother handovers between departments and more predictable daily execution.

More like this

Numakers Asia LLP

Numakers Asia LLP, a small packaging manufacturer in Surat, faced significant operational challenges, including miscommunication on vendor commitments and a lack of synchronization between dispatch processes. To address these issues, they implemented a centralized workflow that streamlined coordination across departments. This transformation led to improved execution predictability and reduced reliance on individual team members for updates. Discover how this approach not only stabilized their planning but also enhanced their overall operational efficiency.

Read More

Hira packaging solutions

Hira Packaging Solutions implemented a centralized workflow to tackle significant operational challenges, such as unclear work-in-progress quantities and disjointed communication across departments. This approach transformed their order-to-dispatch processes, leading to improved execution predictability and streamlined reporting. The team transitioned from reliance on scattered tools and outdated methods to a cohesive system, enhancing accountability and reducing the frequency of escalations. Discover how these strategic changes reshaped their daily operations and outcomes.

Read More

Omkar Industries

In a bid to enhance operational efficiency, Omkar Industries adopted a centralized workflow solution to tackle persistent coordination challenges. The company faced issues with inconsistent inventory tracking, conflicting reports from different systems, and difficulty in managing vendor follow-ups. By streamlining these processes, they aimed for smoother inter-departmental handovers and improved execution predictability, setting the stage for a more cohesive work environment.

Read More

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders