GLASSTECH COMPONENTS
GLASSTECH COMPONENTS
GLASSTECH COMPONENTS
How GLASSTECH COMPONENTS reduced firefighting using a single system of record

How GLASSTECH COMPONENTS reduced firefighting using a single system of record

How GLASSTECH COMPONENTS reduced firefighting using a single system of record

Bringing purchase, production and dispatch on one timeline—without adding complexity.

30%

Reduction in daily coordination time for engineering work

30%

Reduction in daily coordination time for engineering work

29%

Reduction in excess inventory across store and production

29%

Reduction in excess inventory across store and production

8→1 days

Improvement in order-to-dispatch lead time with fewer last-minute follow-ups

8→1 days

Improvement in order-to-dispatch lead time with fewer last-minute follow-ups

Hero Background

Inside GLASSTECH COMPONENTS

Inside GLASSTECH COMPONENTS

GLASSTECH COMPONENTS is a micro engineering manufacturing unit based in Vadodara. Their day-to-day work involves coordinating orders, material availability, production execution and dispatch commitments. Earlier, updates were shared through a mix of Excel sheets, calls and WhatsApp, which made it hard to keep everyone aligned. By moving to a centralised workflow, the team standardised handovers, reduced rework in reporting, and improved execution predictability.

Workspace Icon

Engineering

Industry

Workspace Icon

Engineering

Industry

Workspace Icon

Micro

Company Size

Workspace Icon

Micro

Company Size

Workspace Icon

Vadodara, India

Location

Workspace Icon

Vadodara, India

Location

Workspace Icon

Multi-stage production planning + WIP control

Use Cases

Workspace Icon

Multi-stage production planning + WIP control

Use Cases

Challenges

Store stock looked fine on paper but production bins were empty when job cards started.

Customer statements took hours to reconcile due to scattered notes and missing debit/credit references.

Production plan changed multiple times a day due to capacity conflicts and material gaps.

Before: Too many moving parts, no single view

Before: Too many moving parts, no single view

Before: Too many moving parts, no single view

Earlier, store stock, WIP and finished goods were tracked in separate sheets and message threads. This broke down whenever priorities changed—material looked available, but the line stalled due to bin-level shortages. We implemented a centralised workflow where each order, material requirement and update had a clear owner and timestamp. Supervisors started reviewing shortages at shift start and raised purchase/transfer requests before the line was blocked. The practical outcome was smoother handovers between departments and more predictable daily execution.

Earlier, store stock, WIP and finished goods were tracked in separate sheets and message threads. This broke down whenever priorities changed—material looked available, but the line stalled due to bin-level shortages. We implemented a centralised workflow where each order, material requirement and update had a clear owner and timestamp. Supervisors started reviewing shortages at shift start and raised purchase/transfer requests before the line was blocked. The practical outcome was smoother handovers between departments and more predictable daily execution.

Controlling rework through traceability and holds

Controlling rework through traceability and holds

Controlling rework through traceability and holds

Earlier, collections follow-ups were scattered and disputes reopened older invoices. This broke down on part-payments; the receivable view changed daily and escalations increased. We implemented a centralised workflow where each order, material requirement and update had a clear owner and timestamp. Collections follow-ups moved to a single list with dispute tagging so teams stopped chasing the wrong invoices. It also made owner reviews easier because key exceptions were visible without chasing the team. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Earlier, collections follow-ups were scattered and disputes reopened older invoices. This broke down on part-payments; the receivable view changed daily and escalations increased. We implemented a centralised workflow where each order, material requirement and update had a clear owner and timestamp. Collections follow-ups moved to a single list with dispute tagging so teams stopped chasing the wrong invoices. It also made owner reviews easier because key exceptions were visible without chasing the team. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Vendor coordination with structured PO follow-ups

Vendor coordination with structured PO follow-ups

Vendor coordination with structured PO follow-ups

Earlier, the daily plan was decided in fragments—by urgency, not by capacity and material signals. This broke down as soon as urgent orders came in; jobs were half-started and WIP piled up across stages. We implemented a centralised workflow where each order, material requirement and update had a clear owner and timestamp. Planning moved to a simple daily schedule linked to orders, capacity and material, reducing last-minute reshuffles. It also made owner reviews easier because key exceptions were visible without chasing the team. The practical outcome was smoother handovers between departments and more predictable daily execution.

Earlier, the daily plan was decided in fragments—by urgency, not by capacity and material signals. This broke down as soon as urgent orders came in; jobs were half-started and WIP piled up across stages. We implemented a centralised workflow where each order, material requirement and update had a clear owner and timestamp. Planning moved to a simple daily schedule linked to orders, capacity and material, reducing last-minute reshuffles. It also made owner reviews easier because key exceptions were visible without chasing the team. The practical outcome was smoother handovers between departments and more predictable daily execution.

More like this

Numakers Asia LLP

Numakers Asia LLP, a small packaging manufacturer in Surat, faced significant operational challenges, including miscommunication on vendor commitments and a lack of synchronization between dispatch processes. To address these issues, they implemented a centralized workflow that streamlined coordination across departments. This transformation led to improved execution predictability and reduced reliance on individual team members for updates. Discover how this approach not only stabilized their planning but also enhanced their overall operational efficiency.

Read More

Hira packaging solutions

Hira Packaging Solutions implemented a centralized workflow to tackle significant operational challenges, such as unclear work-in-progress quantities and disjointed communication across departments. This approach transformed their order-to-dispatch processes, leading to improved execution predictability and streamlined reporting. The team transitioned from reliance on scattered tools and outdated methods to a cohesive system, enhancing accountability and reducing the frequency of escalations. Discover how these strategic changes reshaped their daily operations and outcomes.

Read More

Omkar Industries

In a bid to enhance operational efficiency, Omkar Industries adopted a centralized workflow solution to tackle persistent coordination challenges. The company faced issues with inconsistent inventory tracking, conflicting reports from different systems, and difficulty in managing vendor follow-ups. By streamlining these processes, they aimed for smoother inter-departmental handovers and improved execution predictability, setting the stage for a more cohesive work environment.

Read More

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory