Integrated Gas Controls Technologies
Integrated Gas Controls Technologies
Integrated Gas Controls Technologies
From scattered sheets to one workflow: Integrated Gas Controls Technologies's ops reset

From scattered sheets to one workflow: Integrated Gas Controls Technologies's ops reset

From scattered sheets to one workflow: Integrated Gas Controls Technologies's ops reset

A practical shift from WhatsApp/Excel coordination to trackable daily execution.

32%

Reduction in daily coordination time for auto ancillary work

32%

Reduction in daily coordination time for auto ancillary work

21%

Reduction in excess inventory across store and production

21%

Reduction in excess inventory across store and production

8→1 days

Improvement in order-to-dispatch lead time with fewer last-minute follow-ups

8→1 days

Improvement in order-to-dispatch lead time with fewer last-minute follow-ups

Hero Background

About Integrated Gas Controls Technologies

About Integrated Gas Controls Technologies

Integrated Gas Controls Technologies is a micro auto ancillary manufacturing unit based in Hyderabad. Their day-to-day work involves coordinating orders, material availability, production execution and dispatch commitments. Earlier, updates were shared through a mix of Excel sheets, calls and WhatsApp, which made it hard to keep everyone aligned. By moving to a centralised workflow, the team standardised handovers, reduced rework in reporting, and improved execution predictability.

Workspace Icon

Auto Ancillary

Industry

Workspace Icon

Auto Ancillary

Industry

Workspace Icon

Micro

Company Size

Workspace Icon

Micro

Company Size

Workspace Icon

Hyderabad, India

Location

Workspace Icon

Hyderabad, India

Location

Workspace Icon

Consumable/tooling control with daily WIP view

Use Cases

Workspace Icon

Consumable/tooling control with daily WIP view

Use Cases

Challenges

Rejections were logged on paper; rework cost showed up only after dispatch was missed.

Priority orders jumped the queue; other jobs got half-started and left in between.

No simple view of vendor-wise delays, so the same issues repeated every month.

Dispatch readiness built into the daily routine

Dispatch readiness built into the daily routine

Dispatch readiness built into the daily routine

Earlier, QC holds and rework notes were kept on paper and were not visible to planning. This broke down during rejections; without traceability, isolating root cause took days and blocked dispatch. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. QC marked holds against lots, and planners saw only cleared stock as available for production. The practical outcome was smoother handovers between departments and more predictable daily execution.

Earlier, QC holds and rework notes were kept on paper and were not visible to planning. This broke down during rejections; without traceability, isolating root cause took days and blocked dispatch. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. QC marked holds against lots, and planners saw only cleared stock as available for production. The practical outcome was smoother handovers between departments and more predictable daily execution.

Controlling rework through traceability and holds

Controlling rework through traceability and holds

Controlling rework through traceability and holds

Earlier, the daily plan was decided in fragments—by urgency, not by capacity and material signals. This broke down as soon as urgent orders came in; jobs were half-started and WIP piled up across stages. We implemented structured stage-wise tracking and checklists so work moved forward only when prerequisites were met. Planning moved to a simple daily schedule linked to orders, capacity and material, reducing last-minute reshuffles. Over time, the team built confidence because the numbers matched what they saw on the floor. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Earlier, the daily plan was decided in fragments—by urgency, not by capacity and material signals. This broke down as soon as urgent orders came in; jobs were half-started and WIP piled up across stages. We implemented structured stage-wise tracking and checklists so work moved forward only when prerequisites were met. Planning moved to a simple daily schedule linked to orders, capacity and material, reducing last-minute reshuffles. Over time, the team built confidence because the numbers matched what they saw on the floor. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Implementation: Centralised workflow with clear owners

Implementation: Centralised workflow with clear owners

Implementation: Centralised workflow with clear owners

Earlier, vendor follow-ups were call-driven and depended on whoever remembered to push. This broke down during peak load—approvals got delayed and committed dates slipped without a simple exception view. We implemented structured stage-wise tracking and checklists so work moved forward only when prerequisites were met. The purchase team used one follow-up queue, logged committed dates, and escalated exceptions early. It also made owner reviews easier because key exceptions were visible without chasing the team. The practical outcome was smoother handovers between departments and more predictable daily execution.

Earlier, vendor follow-ups were call-driven and depended on whoever remembered to push. This broke down during peak load—approvals got delayed and committed dates slipped without a simple exception view. We implemented structured stage-wise tracking and checklists so work moved forward only when prerequisites were met. The purchase team used one follow-up queue, logged committed dates, and escalated exceptions early. It also made owner reviews easier because key exceptions were visible without chasing the team. The practical outcome was smoother handovers between departments and more predictable daily execution.

More like this

Numakers Asia LLP

Numakers Asia LLP, a small packaging manufacturer in Surat, faced significant operational challenges, including miscommunication on vendor commitments and a lack of synchronization between dispatch processes. To address these issues, they implemented a centralized workflow that streamlined coordination across departments. This transformation led to improved execution predictability and reduced reliance on individual team members for updates. Discover how this approach not only stabilized their planning but also enhanced their overall operational efficiency.

Read More

Hira packaging solutions

Hira Packaging Solutions implemented a centralized workflow to tackle significant operational challenges, such as unclear work-in-progress quantities and disjointed communication across departments. This approach transformed their order-to-dispatch processes, leading to improved execution predictability and streamlined reporting. The team transitioned from reliance on scattered tools and outdated methods to a cohesive system, enhancing accountability and reducing the frequency of escalations. Discover how these strategic changes reshaped their daily operations and outcomes.

Read More

Omkar Industries

In a bid to enhance operational efficiency, Omkar Industries adopted a centralized workflow solution to tackle persistent coordination challenges. The company faced issues with inconsistent inventory tracking, conflicting reports from different systems, and difficulty in managing vendor follow-ups. By streamlining these processes, they aimed for smoother inter-departmental handovers and improved execution predictability, setting the stage for a more cohesive work environment.

Read More

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders