Kanchan Metals Pvt Ltd
Kanchan Metals Pvt Ltd
Kanchan Metals Pvt Ltd
Kanchan Metals Pvt Ltd tightened shop-floor control with a centralised workflow

Kanchan Metals Pvt Ltd tightened shop-floor control with a centralised workflow

Kanchan Metals Pvt Ltd tightened shop-floor control with a centralised workflow

A practical shift from WhatsApp/Excel coordination to trackable daily execution.

32%

Reduction in daily coordination time for engineering work

32%

Reduction in daily coordination time for engineering work

30%

Reduction in excess inventory across store and production

30%

Reduction in excess inventory across store and production

8→2 days

Improvement in order-to-dispatch lead time with fewer last-minute follow-ups

8→2 days

Improvement in order-to-dispatch lead time with fewer last-minute follow-ups

Hero Background

About Kanchan Metals Pvt Ltd

About Kanchan Metals Pvt Ltd

Kanchan Metals Pvt Ltd is a micro engineering manufacturing unit based in Gautam Buddha Nagar. Their day-to-day work involves coordinating orders, material availability, production execution and dispatch commitments. Earlier, updates were shared through a mix of Excel sheets, calls and WhatsApp, which made it hard to keep everyone aligned. By moving to a centralised workflow, the team standardised handovers, reduced rework in reporting, and improved execution predictability.

Workspace Icon

Engineering

Industry

Workspace Icon

Engineering

Industry

Workspace Icon

Micro

Company Size

Workspace Icon

Micro

Company Size

Workspace Icon

Gautam Buddha Nagar, India

Location

Workspace Icon

Gautam Buddha Nagar, India

Location

Workspace Icon

Multi-stage production planning + WIP control

Use Cases

Workspace Icon

Multi-stage production planning + WIP control

Use Cases

Challenges

Vendor committed dates were verbal; delays were discovered only after repeated calls.

QC holds were not reflected in available stock, leading to accidental usage.

Receivable status changed daily because part-payments were not tagged to specific invoices.

Implementation: Centralised workflow with clear owners

Implementation: Centralised workflow with clear owners

Implementation: Centralised workflow with clear owners

Earlier, vendor follow-ups were call-driven and depended on whoever remembered to push. This broke down during peak load—approvals got delayed and committed dates slipped without a simple exception view. We implemented a centralised workflow where each order, material requirement and update had a clear owner and timestamp. The purchase team used one follow-up queue, logged committed dates, and escalated exceptions early. Over time, the team built confidence because the numbers matched what they saw on the floor. The practical outcome was smoother handovers between departments and more predictable daily execution.

Earlier, vendor follow-ups were call-driven and depended on whoever remembered to push. This broke down during peak load—approvals got delayed and committed dates slipped without a simple exception view. We implemented a centralised workflow where each order, material requirement and update had a clear owner and timestamp. The purchase team used one follow-up queue, logged committed dates, and escalated exceptions early. Over time, the team built confidence because the numbers matched what they saw on the floor. The practical outcome was smoother handovers between departments and more predictable daily execution.

Before: Too many moving parts, no single view

Before: Too many moving parts, no single view

Before: Too many moving parts, no single view

Earlier, QC holds and rework notes were kept on paper and were not visible to planning. This broke down during rejections; without traceability, isolating root cause took days and blocked dispatch. We implemented structured stage-wise tracking and checklists so work moved forward only when prerequisites were met. QC marked holds against lots, and planners saw only cleared stock as available for production. For engineering operations in Gautam Buddha Nagar, this reduced dependence on a single person for updates. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Earlier, QC holds and rework notes were kept on paper and were not visible to planning. This broke down during rejections; without traceability, isolating root cause took days and blocked dispatch. We implemented structured stage-wise tracking and checklists so work moved forward only when prerequisites were met. QC marked holds against lots, and planners saw only cleared stock as available for production. For engineering operations in Gautam Buddha Nagar, this reduced dependence on a single person for updates. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Reducing month-end surprises with traceable transactions

Reducing month-end surprises with traceable transactions

Reducing month-end surprises with traceable transactions

Earlier, collections follow-ups were scattered and disputes reopened older invoices. This broke down on part-payments; the receivable view changed daily and escalations increased. We implemented structured stage-wise tracking and checklists so work moved forward only when prerequisites were met. Collections follow-ups moved to a single list with dispute tagging so teams stopped chasing the wrong invoices. The practical outcome was that teams stopped re-entering the same data and acted on exceptions early.

Earlier, collections follow-ups were scattered and disputes reopened older invoices. This broke down on part-payments; the receivable view changed daily and escalations increased. We implemented structured stage-wise tracking and checklists so work moved forward only when prerequisites were met. Collections follow-ups moved to a single list with dispute tagging so teams stopped chasing the wrong invoices. The practical outcome was that teams stopped re-entering the same data and acted on exceptions early.

More like this

Numakers Asia LLP

Numakers Asia LLP, a small packaging manufacturer in Surat, faced significant operational challenges, including miscommunication on vendor commitments and a lack of synchronization between dispatch processes. To address these issues, they implemented a centralized workflow that streamlined coordination across departments. This transformation led to improved execution predictability and reduced reliance on individual team members for updates. Discover how this approach not only stabilized their planning but also enhanced their overall operational efficiency.

Read More

Hira packaging solutions

Hira Packaging Solutions implemented a centralized workflow to tackle significant operational challenges, such as unclear work-in-progress quantities and disjointed communication across departments. This approach transformed their order-to-dispatch processes, leading to improved execution predictability and streamlined reporting. The team transitioned from reliance on scattered tools and outdated methods to a cohesive system, enhancing accountability and reducing the frequency of escalations. Discover how these strategic changes reshaped their daily operations and outcomes.

Read More

Omkar Industries

In a bid to enhance operational efficiency, Omkar Industries adopted a centralized workflow solution to tackle persistent coordination challenges. The company faced issues with inconsistent inventory tracking, conflicting reports from different systems, and difficulty in managing vendor follow-ups. By streamlining these processes, they aimed for smoother inter-departmental handovers and improved execution predictability, setting the stage for a more cohesive work environment.

Read More

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders