Kusum Engineering Works
Kusum Engineering Works
Kusum Engineering Works
Kusum Engineering Works tightened shop-floor control with a centralised workflow

Kusum Engineering Works tightened shop-floor control with a centralised workflow

Kusum Engineering Works tightened shop-floor control with a centralised workflow

A practical shift from WhatsApp/Excel coordination to trackable daily execution.

55%

Reduction in daily coordination time for engineering work

55%

Reduction in daily coordination time for engineering work

19%

Reduction in excess inventory across store and production

19%

Reduction in excess inventory across store and production

9→3 days

Improvement in order-to-dispatch lead time with fewer last-minute follow-ups

9→3 days

Improvement in order-to-dispatch lead time with fewer last-minute follow-ups

Hero Background

How Kusum Engineering Works operates

How Kusum Engineering Works operates

Kusum Engineering Works is a medium engineering manufacturing unit based in Mumbai. Their day-to-day work involves coordinating orders, material availability, production execution and dispatch commitments. Earlier, updates were shared through a mix of Excel sheets, calls and WhatsApp, which made it hard to keep everyone aligned. By moving to a centralised workflow, the team standardised handovers, reduced rework in reporting, and improved execution predictability.

Workspace Icon

Engineering

Industry

Workspace Icon

Engineering

Industry

Workspace Icon

Medium

Company Size

Workspace Icon

Medium

Company Size

Workspace Icon

Mumbai, India

Location

Workspace Icon

Mumbai, India

Location

Workspace Icon

Centralised purchase & vendor performance tracking

Use Cases

Workspace Icon

Centralised purchase & vendor performance tracking

Use Cases

Challenges

Customer statements took hours to reconcile due to scattered notes and missing debit/credit references.

Production plan changed multiple times a day due to capacity conflicts and material gaps.

PO approvals got stuck with managers, leading to last-minute buying and frequent expedite.

Dispatch readiness built into the daily routine

Dispatch readiness built into the daily routine

Dispatch readiness built into the daily routine

Earlier, collections follow-ups were scattered and disputes reopened older invoices. This broke down on part-payments; the receivable view changed daily and escalations increased. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. Collections follow-ups moved to a single list with dispute tagging so teams stopped chasing the wrong invoices. For engineering operations in Mumbai, this reduced dependence on a single person for updates. The practical outcome was smoother handovers between departments and more predictable daily execution.

Earlier, collections follow-ups were scattered and disputes reopened older invoices. This broke down on part-payments; the receivable view changed daily and escalations increased. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. Collections follow-ups moved to a single list with dispute tagging so teams stopped chasing the wrong invoices. For engineering operations in Mumbai, this reduced dependence on a single person for updates. The practical outcome was smoother handovers between departments and more predictable daily execution.

Reducing month-end surprises with traceable transactions

Reducing month-end surprises with traceable transactions

Reducing month-end surprises with traceable transactions

Earlier, the daily plan was decided in fragments—by urgency, not by capacity and material signals. This broke down as soon as urgent orders came in; jobs were half-started and WIP piled up across stages. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. Planning moved to a simple daily schedule linked to orders, capacity and material, reducing last-minute reshuffles. The practical outcome was smoother handovers between departments and more predictable daily execution.

Earlier, the daily plan was decided in fragments—by urgency, not by capacity and material signals. This broke down as soon as urgent orders came in; jobs were half-started and WIP piled up across stages. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. Planning moved to a simple daily schedule linked to orders, capacity and material, reducing last-minute reshuffles. The practical outcome was smoother handovers between departments and more predictable daily execution.

Cleaning masters to make reports match reality

Cleaning masters to make reports match reality

Cleaning masters to make reports match reality

Earlier, vendor follow-ups were call-driven and depended on whoever remembered to push. This broke down during peak load—approvals got delayed and committed dates slipped without a simple exception view. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. The purchase team used one follow-up queue, logged committed dates, and escalated exceptions early. It also made owner reviews easier because key exceptions were visible without chasing the team. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

Earlier, vendor follow-ups were call-driven and depended on whoever remembered to push. This broke down during peak load—approvals got delayed and committed dates slipped without a simple exception view. We implemented a single system of record connecting sales, purchase, production and dispatch so everyone worked off the same status. The purchase team used one follow-up queue, logged committed dates, and escalated exceptions early. It also made owner reviews easier because key exceptions were visible without chasing the team. The practical outcome was fewer escalations, faster decisions, and dates that changed less often.

More like this

Numakers Asia LLP

Numakers Asia LLP, a small packaging manufacturer in Surat, faced significant operational challenges, including miscommunication on vendor commitments and a lack of synchronization between dispatch processes. To address these issues, they implemented a centralized workflow that streamlined coordination across departments. This transformation led to improved execution predictability and reduced reliance on individual team members for updates. Discover how this approach not only stabilized their planning but also enhanced their overall operational efficiency.

Read More

Hira packaging solutions

Hira Packaging Solutions implemented a centralized workflow to tackle significant operational challenges, such as unclear work-in-progress quantities and disjointed communication across departments. This approach transformed their order-to-dispatch processes, leading to improved execution predictability and streamlined reporting. The team transitioned from reliance on scattered tools and outdated methods to a cohesive system, enhancing accountability and reducing the frequency of escalations. Discover how these strategic changes reshaped their daily operations and outcomes.

Read More

Omkar Industries

In a bid to enhance operational efficiency, Omkar Industries adopted a centralized workflow solution to tackle persistent coordination challenges. The company faced issues with inconsistent inventory tracking, conflicting reports from different systems, and difficulty in managing vendor follow-ups. By streamlining these processes, they aimed for smoother inter-departmental handovers and improved execution predictability, setting the stage for a more cohesive work environment.

Read More

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders