Kanban: Meaning, Rules & How It Works in a Factory

6 min read

By

TranZact Solutions Team

· Published

Hero Background
Functions of ERP System Explained

Kanban (Japanese for 'signboard') is a visual pull system: work or material moves only when a card or signal asks for it. Toyota developed it so each process makes only what the next process has used. In a factory, a kanban card on an empty bin tells the store or the previous process which part to refill and how much. In offices, teams use kanban boards with To Do, In Progress and Done columns.

What does kanban mean?

The word kanban means "signboard" or "visual card" in Japanese. Taiichi Ohno built the system at Toyota, taking the idea from American supermarkets. There, a shelf is refilled only after shoppers take goods off it.

Toyota first used it in the main plant's machine shop in 1953. The core idea is pull, not push. Push makes parts to a forecast. Pull makes parts only after the next step has used them.

How a kanban system works in a factory

The loop is simple. A worker uses up a bin of parts. The empty bin or its card goes back to the store or the previous process. That process refills a fixed quantity, and the full bin returns to the line.

Production kanban and withdrawal kanban

A production kanban tells a process to make a part. A withdrawal kanban (also called a move or conveyance kanban) tells someone to move parts to the next step. You can start with withdrawal cards between the store and the line, then add production cards.

Two-bin kanban in the store room

Two-bin is the easiest version for a small factory. Each part sits in two bins. The line works from the first bin, and when it empties, the bin or its card goes for refill.

Here is an example with illustrative numbers. An auto-parts unit keeps M8 bolts in two bins of 500 at the assembly line. When bin one empties, the store refills it while the line draws from bin two. Size each bin to cover use during the refill time, plus some safety stock.

What goes on a kanban card

  • Part name and part number

  • Refill quantity (the bin size)

  • Where it is used: line, machine or process

  • Where it comes from: store, previous process or supplier

  • Card number, such as "2 of 3"

  • Time allowed to refill

Is this part a good kanban fit?
  • Used every week

  • Steady, predictable demand

  • Short, reliable refill time

  • Same part across many jobs

  • Fits in a standard bin

Kanban vs MRP: which does your factory need?

Kanban reacts to what was used. MRP plans ahead from orders and BOMs. Many Indian factories need both, each for different parts.

Aspect

Kanban

MRP

Best for

Repeat parts with steady demand

Make-to-order jobs and one-off parts

Refill trigger

Empty bin or card

Sales orders and BOMs

Supplier lead time

Short and reliable

Long or uncertain

Typical items

Fasteners, consumables, packing material

Customer-specific castings, imported parts

Is kanban an ERP system?

No. Kanban is a method, not software. An ERP or manufacturing software can hold the kanban signal and the flow. The signal becomes a reorder level with a stock alert. The flow becomes work orders and routing.

Paper kanban vs kanban-style in TranZact


Paper kanban

Kanban-style in TranZact

Refill signal

Card on an empty bin

Reorder level and AI stock alert

Where stock sits

Label on the bin

Bin card and multi-store

Bought parts

Card sent to the buyer

MRP report, indent, RFQ, PO, GRN

In-house parts

Production kanban card

Work order with process routing

Running kanban-style replenishment in TranZact

Paper kanban works for a few dozen items. It breaks down with many stores, many items or job work going out. TranZact is manufacturing AI software used by 10,000+ manufacturers.

First, the honest limit. TranZact has no dedicated kanban board or kanban-card feature. Kanban-style replenishment runs through reorder levels and AI stock alerts instead.

Set a reorder level for each repeat item in inventory management. When stock falls to that level, an AI stock alert flags it for refill. Bin card and multi-store show where each item sits.

For bought parts, the purchase flow runs MRP report, indent, RFQ, PO and GRN. The MRP engine runs through your orders and BOMs, then tells you what to buy and when.

For parts you make in-house, use work orders and process routing in production management. Accounts stay in Tally, Busy or Zoho Books, with one-way sync and no double entry. TranZact goes live in 2–3 weeks. Plans are on the pricing page.

Book a demo →

How to start kanban in your factory in 5 steps

  1. Pick 10–20 repeat items. Start with parts you use every week, like fasteners, consumables and packing material.

  2. Fix the refill quantity. Set a bin size that covers use during the refill time.

  3. Set a reorder level per item. This is the point where refill starts. Add a buffer for late suppliers.

  4. Make the signal visible. Use cards, coloured bins or a system alert the store team sees.

  5. Review monthly. Change bin sizes when demand shifts, and remove cards as flow improves.

Toyota's 6 rules of kanban

  1. Customer (downstream) processes withdraw items in the precise amounts specified on the kanban. The line takes only what the card says.

  2. Supplier (upstream) produces items in the precise amounts and sequences specified by the kanban. Nothing extra just because the machine is already set up.

  3. No items are made or moved without a kanban. No card, no work.

  4. A kanban should accompany each item, every time. The card stays with the bin.

  5. Defects and incorrect amounts are never sent to the next downstream process. Bad parts stop where they were made.

  6. The number of kanbans is reduced carefully to lower inventories and to reveal problems. Fewer cards mean less stock, and hidden problems show up sooner.

Kanban boards: To Do, In Progress, Done

Offices and software teams borrowed kanban as a board. Each task is a card that moves across columns: To Do, In Progress and Done. A work-in-progress (WIP) limit caps how many cards one column can hold.

The Kanban Method, from Kanban University, has six practices. They are: visualise the work, limit WIP, manage flow, make policies explicit, use feedback loops, and improve through experiments. Jira is a software tool that offers kanban boards. Kanban is the method; Jira is one place to run it.

Kanban vs Scrum

Both are used by agile teams, but they run differently. Kanban is continuous flow. Scrum works in fixed sprints.

Aspect

Kanban

Scrum

Roles

None required

Product Owner, Scrum Master, Developers

Cadence

Continuous flow

Fixed sprints of one month or less

Change

Add work any time, within WIP limits

New work usually waits for the next sprint

Main measure

Lead time and cycle time

Work finished per sprint

Is kanban lean or Six Sigma?

Kanban is a lean tool. It comes from the Toyota Production System, the root of lean and just-in-time manufacturing. Six Sigma is a separate method that cuts process variation and defects. The two can run side by side. See how lean compares with traditional manufacturing.

Start with your repeat parts

Don't be the bottleneck. Become the AI-Run Factory. Bring your list of repeat parts, and we'll show you how reorder levels and stock alerts would run them.

Book a demo →

Check out other blogs

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders