QA vs QC: The Difference, With Factory Examples

6 min read

By

TranZact Solutions Team

· Published

Hero Background
Functions of ERP System Explained

QA vs QC in one minute

QA (quality assurance) prevents defects by setting the process: written specs, work instructions, trained people, calibrated gauges and audits. QC (quality control) catches defects by checking the product: raw material at the GRN, parts on the shop floor, finished goods before dispatch. QA asks whether your process will make good parts every time. QC asks whether this lot is good right now. Every QC rejection should feed back into QA to fix the cause.

  • Prevent vs catch. QA stops defects before they happen. QC finds the ones that got through.

  • Process vs product. QA works on how you make the part. QC works on the part itself.

  • Everyone vs inspectors. QA is everyone's job. QC is the checker's.

QA vs QC: side-by-side table

Point

QA (quality assurance)

QC (quality control)

Goal

Prevent defects

Find defects

Focus

The process

The product

Timing

Before and during production

During and after production

Question it asks

Will our process make good parts every time

Is this lot good right now

Who does it

Owner, plant head, all staff

Inspector, stores

Typical activities

Specs, SOPs, training, gauge calibration, audits

Incoming, in-process and final checks

Records kept

Specs, SOPs, training and audit records, CAPA

Inspection reports, accepted and rejected quantity

Factory example

Approving a new resin supplier

Checking moulded caps for flash

Which comes first, and is QC part of QA?

QA comes first. You set the spec, the method and the gauge before anyone checks a part. QC is the checking job that runs inside that system.

So yes, QC is part of the wider quality system that QA builds. Inspection is one QC method: measuring, looking at or testing a part against the spec. For inspection types, sampling and checklists, see our guide to quality inspection.

Where QA and QC sit in a factory, stage by stage

  1. Supplier approval (QA). You approve the supplier and agree the spec before the first PO. A simple vendor rating helps here.

  2. Incoming check at the GRN (QC). Stores and the inspector check the lot before accepting it. See our GRN format guide.

  3. First-piece approval (QC). The first part off a new setup is checked before the run starts.

  4. In-process checks (QC). Operators or a line inspector check parts at set intervals.

  5. Final check before dispatch (QC). Finished goods are checked against the customer's spec.

  6. Customer returns (QC). Returned parts are checked to confirm the defect.

  7. Root cause and SOP change (QA). The cause is found, and the process, spec or training changes.

Incoming raw material: QA or QC?

Checking the lot at the gate is QC. Approving the supplier and writing the incoming spec is QA. Sources disagree on raw-material batch sampling: some call it QC, others count supplier-side sampling as QA. What matters is that one person owns it and records it.

Worked example: a QC rejection that becomes a QA fix

The numbers here are illustrative. A plant receives 2,000 brass bushes. At the GRN, the inspector finds oversize bores.

Sorting passes 1,700 and fails 300, recorded against the batch and supplier. The 300 go back with a debit note, as our purchase return guide explains.

It is this supplier's third rejection this quarter: a QA signal. QA tightens the bore tolerance, audits the supplier and raises incoming sampling until three lots pass.

From QC rejection to QA fix
  1. QC rejects part of the lot at GRN

  2. Record batch, supplier and reason

  3. Return rejects with a debit note

  4. Spot the supplier's repeat rejections

  5. QA fixes spec, audit and sampling

Paper, Excel or software for QC records

Most small plants keep QC in a gate register or an Excel sheet. The checks happen, but the record sits apart from stock. It has no link to the batch, the GRN or the stock ledger.

That is where things break. Stores books the full quantity, so a rejected lot shows up as usable stock. A customer complaint arrives, and nobody can trace which supplier lot it came from. Linking each check to batch tracking fixes both problems.

Where TranZact fits for a manufacturer

TranZact is manufacturing AI software used by 10,000+ manufacturers. Its purchase flow runs MRP report → indent → RFQ → PO → GRN → payment. Incoming QC belongs at the GRN step in that flow.

Raw material QC and finished goods QC come with the Dominate plan. The pricing page lists it as "Batch Tracking & QC". Dominate is ₹30,000/month billed yearly, with 12 users. Batch-wise stock tracking starts at Scale+, at ₹16,666/month billed yearly with 8 users.

The honest limit: quality control is not in Grow or Scale+. Software records checks; it does not replace your inspector or your QA system. Accounting stays in Tally through a one-way sync, with no double entry. TranZact goes live in 2–3 weeks.

Book a demo →

What every QC record should capture
  • Batch or lot number

  • Accepted and rejected quantity

  • Reason for rejection

  • Supplier, machine or shift

  • Name of the checker

  • Linked GRN or work order

Examples of QA and QC in manufacturing

  • Machined parts: QA calibrates micrometers and writes the inspection plan. QC measures the bore on the first piece and at intervals.

  • Plastic moulding: QA locks process settings for each mould. QC checks caps for flash and short shots.

  • Packaging: QA agrees the board grade with the supplier. QC burst-tests each incoming box lot.

  • Food plant: QA sets the cleaning schedule and hygiene training. QC checks pack weight and seal.

  • Chemicals: QA writes the batch procedure and lab method. QC tests each batch before release.

Who does QA and QC in a small factory?

Most 20–200 person plants have one quality person, or none. You don't need two teams. You need a clear split.

  • Owner or plant head owns QA: specs, SOPs, training and regular internal audits.

  • Stores plus one inspector run QC: incoming checks at the gate, first piece and final check before dispatch.

  • Keep checker and maker separate: the operator who made a lot should not be the only one passing it.

Who is responsible for QA and who for QC?

QA belongs to the owner or plant head. QC belongs to the people who check: the inspector, stores and line checkers.

SPC vs SQC, and other QA/QC tools in plain words

SPC (statistical process control) watches the process while it runs, usually with control charts. SQC (statistical quality control) is the wider term. It covers SPC plus acceptance sampling of finished or incoming lots.

  • Control charts: plot a measurement over time to spot drift before parts go out of spec.

  • Sampling and AQL: check a sample of a lot instead of every piece. The quality inspection guide above explains it.

  • CAPA: corrective and preventive action, the written record of a cause and its fix.

  • Internal audits: checking that people actually follow the SOPs.

The ISO 9000 family of standards covers both QA and QC in one quality system. Comparing software for your QC records? Our quality control software buying guide lists what to check.

Book a demo

Don't be the bottleneck. Become the AI-Run Factory. See how your GRN, batches and QC records fit together on your own flow.

Book a demo →

Check out other blogs

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders