Quality Control: Meaning, Steps & Types for Factories

6 min read

By

TranZact Solutions Team

· Published

Hero Background
Functions of ERP System Explained

What is quality control?

Quality control (QC) is the checking a manufacturer does before material moves to the next step. It makes sure raw material, work in progress and finished goods meet the agreed specification. ISO 9000 defines it as the part of quality management focused on fulfilling quality requirements.

In manufacturing, QC usually happens at four points: incoming material, in-process, final inspection and before dispatch. Each lot is recorded as accepted, rejected or sent for rework.

A simple example: an auto-parts maker measures shaft diameter on a sample from every lot. Shafts outside the tolerance on the drawing are held back, not shipped.

The 4 stages of quality control in a factory

The table shows where each check sits and what it decides.

Stage

When

What is checked

Possible result

Incoming QC (IQC)

At GRN

Raw material, bought-out parts

Accept, reject, return to vendor

In-process QC (IPQC)

During production

First piece, patrol samples

Continue, adjust, stop the run

Final QC (FQC)

Before packing

Finished goods against spec

Pass, rework, scrap

Outgoing QC (OQC)

Before dispatch

Quantity, packing, labels, documents

Release or hold

Incoming QC (IQC): raw material at GRN

A food processor checks moisture in incoming grain. A pharma unit tests each lot of active ingredient before release.

Record the result on the goods receipt note. Our GRN format guide shows the fields. Incoming rejections per supplier also feed your vendor rating.

In-process QC (IPQC): first-piece approval and patrol checks

The first piece off a new setup is approved before the run starts. Patrol samples follow at set times. A plastic moulding unit checks weight, flash and short shots after every mould change.

Final QC (FQC): finished goods before packing

Many manufacturers use an AQL sampling plan to decide how many pieces to check per lot.

Outgoing QC (OQC): before dispatch

Check batch numbers and the documents that travel with the goods. A wrong label can get a good product rejected at the customer's gate.

How to set up quality control: step by step

  1. Write the spec for each item. List each parameter, its target and its tolerance. Take it from the drawing, the customer's spec or the relevant standard.

  2. Set checkpoints for each stage. Decide what is checked at GRN, in-process, final and dispatch. Fix how many pieces you check per lot.

  3. Define defect classes. Critical defects make the product unsafe. Major defects stop it working as intended. Minor defects affect looks, not use.

  4. Decide who inspects and who signs off. The person who makes a part should not be the only one who passes it. Name a backup for every sign-off.

  5. Record the result against each lot or batch. This lets you trace a customer complaint back to its raw-material lot. Batch tracking makes that trace possible. Pharma and food units keep it in their batch manufacturing records.

  6. Handle rejects and update stock. Every reject goes one way: rework, scrap or return to vendor. Update stock the same day, or the system will show material you cannot use.

  7. Review defects every week. Pick the top few defects and fix the root cause, not just the symptom. Then check that the fix held.

What to record against every lot
  • Item and lot or batch number

  • Quantity received and quantity checked

  • Defects found and their class

  • Decision: accept, rework, scrap, return

  • Inspector, approver and date

Where TranZact does quality control for a manufacturer

Steps 5 and 6 are where paper registers usually break. A reject gets noted in a book but never reaches the stock record.

TranZact is manufacturing AI software trusted by 10,000+ manufacturers. It runs sales, purchase, inventory, production and planning on one system.

The Dominate plan adds Raw Material QC and Finished Good QC. They sit next to GRN, work orders, process routing and batch-wise stock tracking. So inspection results live in the same system as your purchase, production and stock records.

Here is the limit, plainly: QC is on the Dominate plan only. See all plans and prices.

Comparing tools first? Our quality control software buying guide covers what to check.

Book a demo →

Quality control vs quality assurance

Quality assurance (QA) is the planned system that gives confidence the requirements will be met. Quality control is checking the product itself. QA works to prevent defects. QC finds them.

Point

Quality assurance (QA)

Quality control (QC)

What it is

The planned system and process

Checking the product

Aim

Prevent defects

Find defects

When

Before and during work

At each checkpoint

Example

Writing the SOP for a moulding machine

Weighing a moulded part

The 7 basic quality control tools

  • Check sheet: a simple tally of defects by type, shift or machine. Most other tools start from this data.

  • Fishbone (cause-and-effect) diagram: lists possible causes of one problem under heads like man, machine, material and method.

  • Pareto chart: ranks defects by count, so you fix the few that cause most rejections.

  • Histogram: shows how measurements spread around the target, such as fill weight on a packing line.

  • Scatter diagram: tests whether two things move together, like mould temperature and shrinkage.

  • Control chart: plots a measurement over time against limits. You see a process drifting before it makes rejects.

  • Stratification: splits data by machine, shift, operator or supplier to show where defects come from. Some lists use a flowchart instead.

Common QC mistakes in small factories

  • Specs live in a supervisor's head. When he is on leave, nobody knows the tolerance.

  • Paper registers. Results get written down but rarely added up, so trends stay hidden.

  • Defect photos on WhatsApp. The proof gets lost in a group chat and never reaches the lot record.

  • Rejects not reflected in stock. The system says 500. Usable stock on the floor is 340.

  • No link between a defect and its raw-material lot. A complaint arrives and nobody can say which supplier lot went into that batch.

None of this is the team's fault. Registers, spreadsheets and chat groups were never built to tie a QC result to stock and production.

QC on paper vs QC in TranZact


Registers and WhatsApp

TranZact (Dominate plan)

Raw material checks

Gate register

Raw Material QC

Finished goods checks

Separate file

Finished Good QC

Batch stock

Hard to trace

Batch-wise stock tracking

Accounts

Typed again into Tally

One-way sync to Tally

Quality control rules Indian manufacturers must know

Some products in India fall under a BIS Quality Control Order (QCO), which makes BIS (ISI) certification compulsory. QCOs cover groups such as toys, many steel products and a range of electrical goods. Orders are added and withdrawn often.

A QCO does not replace your own QC. A BIS licence comes with a testing and inspection scheme the manufacturer must follow.

Where to start

Start with incoming QC at the GRN. It stops bad material before it uses up machine time. To see QC, GRN and batch-wise stock on one screen, book a short walkthrough. Don't be the bottleneck. Become the AI-Run Factory.

Book a demo →

Check out other blogs

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders