What is an indent?
An indent is an internal request for material. Stores, production or maintenance raise it.
Nothing is issued or bought until someone checks the need.
Store indent vs purchase indent
A store indent asks the store to issue material it already holds.
A purchase indent asks the purchase team to buy what is short, after stock in hand and material on order.
Where the indent sits in the purchase flow
The indent comes after a shortage is found, from a material requirement planning (MRP) report or a reorder level. Our MRP software buying guide explains how that list is worked out.
[[IMAGE {"type":"steps","title":"Where the indent sits in purchase","items":["Shortage found: MRP report or reorder level","Indent raised and approved","RFQ to suppliers, then PO","GRN when material arrives","Payment against the supplier bill"]}]]
What each column in the indent format means
One row per item line, so you can filter by job or status.
| Column | What to write | Example |
|---|---|---|
| Indent no/date | A running number, never reused, and the date raised. | IND-0142 / 18-Nov-2026 |
| Type | Store (issue from stock) or Purchase (buy the shortfall). | Purchase |
| Job/due date | The work order, and when material must reach the floor. | WO-0387 / 25-Nov-2026 |
| Item | BOM item code, name, size and grade. | RM-ANG-40 MS angle 40×40×5 mm |
| Unit | The unit you stock and buy in. | m |
| Required | Total the job needs, scrap included. On a store line, the quantity to issue. | 252 |
| In stock | Store stock that no other job has claimed. | 180 |
| On order | Quantity on open POs, not yet received. | 0 |
| Net to buy | Required − in stock − on order, never below 0. The sheet works it out. | 72 |
| Value (₹) | Net to buy × last purchase rate. | 13,680 (72 m × ₹190) |
| Approver | Name of the approver, with the date. | Plant head, 18-Nov |
| Status/PO no | Open, Approved, PO raised, Issued or Closed, plus the PO or issue number. | PO raised: PO-0611 |
How to fill an indent, step by step
- Number and date. Take the next number in the series.
- Pick the type. Store if the material is in stock, purchase if it is short.
- Add the work order and due date.
- One line per item. Copy items from the BOM or shortage list, with the same codes.
- Work out the net quantity. Required − in stock − on order. If it comes to 0, raise a store indent instead.
- Add the value. Net qty × last rate shows the approver the spend.
- Approve and close the loop. Stores checks the stock and the manager signs. Purchase writes the PO number back on the line.
Who approves? Usually the head of the team that raised it, or the plant head. Many owners set a value limit above which the indent comes to them.
Where TranZact fills the indent for you
The Excel sheet works for a few indents a month. With ten open orders sharing the same steel and castors, netting by hand gets slow and mistakes slip in.
TranZact is manufacturing AI software used by 10,000+ manufacturers. Its MRP engine runs through your orders and BOMs, then tells you what to buy and when. The indent follows from the MRP report and moves on to RFQ, PO, GRN and payment in one flow.
- Stock across stores: stock in, issue, bin card and multi-store, in the same system as the indent.
- Low stock: reorder and AI stock alerts are part of inventory.
One honest limit: TranZact does not raise the PO on its own. Your purchase person reviews the list and raises the PO.
| What | Paper or Excel | TranZact |
|---|---|---|
| Quantity to indent | Worked out by hand from the BOM and stock | MRP runs through orders and BOMs |
| Indent to PO | Separate files and follow-up calls | MRP report → indent → RFQ → PO → GRN in one flow |
| Approval | Signature on paper or a WhatsApp message | Approvals and alerts |
| Accounts | Re-typed into Tally | One-way sync to Tally, no double entry |
See the full flow on the purchase management page.
TranZact indent and purchase facts (as of 18 Nov 2026)
| Fact | Detail | Source |
|---|---|---|
| MRP | Runs through your orders and BOMs, then tells you what to buy and when | Purchase management page |
| Purchase flow | MRP report → indent → RFQ → PO → GRN → payment, with vendor coordination | Purchase management page |
| Plans | "Planning (MRP + Indent)" listed in Grow (₹8,333/month, billed yearly, 4 users) and Scale+ (₹16,666/month, 8 users). Dominate (₹30,000/month, 12 users) includes everything in Scale+. No Free plan. | Pricing page |
| Accounts | Accounts stay in Tally, operations run in TranZact; one-way sync. Busy and Zoho Books too. | Pricing page (Tally / Busy / Zoho integration) |
Worked example: indent for an order of 50 steel trolleys
This continues the material check on our bill of materials format page. A fabrication unit has work order WO-0387 for 50 MS shop-floor trolleys. All codes, quantities, rates and dates are illustrative.
Table 1 (Example): purchase indent IND-0142 for WO-0387
| Item | Required | In stock + on order | Net qty to buy |
|---|---|---|---|
| MS angle 40×40×5 mm | 252 m | 180 m + 0 | 72 m |
| Castor wheel 100 mm | 200 nos | 120 nos + 0 | 80 nos |
| Welding rod 3.15 mm | 16.5 kg | 5 kg + 0 | 11.5 kg |
| Enamel paint | 22 litre | 8 litre + 10 litre | 4 litre |
At illustrative rates, the estimated value is ₹29,410. The Excel example shows the value for each line.
Table 2 (Example): store indent SI-0088 for the same job
| Item | Qty to issue | Stock in hand | Issue no |
|---|---|---|---|
| MS sheet 2 mm | 351 kg | 400 kg | ISS-0204 |
| MS angle 40×40×5 mm | 180 m | 180 m | ISS-0204 |
| Castor wheel 100 mm | 120 nos | 120 nos | ISS-0204 |
| Welding rod 3.15 mm | 5 kg | 5 kg | ISS-0204 |
| Enamel paint | 8 litre | 8 litre | ISS-0204 |
Why the lines split this way
MS sheet is on the store indent only. The job needs 351 kg and the store holds 400 kg. Nothing needs to be bought.
Paint nets to 4 litres, not 14. The job needs 22 litres: 8 are in stock and 10 are already on an open PO. Skip the on-order column and you buy those 10 litres twice.
Handle pipe and grips are left out to keep the example short.
Indent vs purchase requisition vs purchase order
A purchase indent and a purchase requisition are the same thing. "Indent" is the shop-floor word in India. "Purchase requisition" is the name in most ERP software.
In procurement, the indent is the first formal step. The purchase order is different: it goes to the supplier.
| Document | Who makes it, who sees it | Binding? | When |
|---|---|---|---|
| Indent | Stores, production or maintenance; seen only inside the company | No | When a need or shortage is found |
| Purchase requisition | Same as a purchase indent, under its formal name | No | Same as an indent |
| Purchase order | Purchase team; sent to the supplier | Yes, once the supplier accepts it | After the indent is approved and quotes are compared |
For the next document, see our purchase order format. When material arrives, it is checked in on a goods received note (GRN).
Common indent mistakes
- Ignoring material on order. Open POs are not netted off, so the same item gets bought twice.
- No work order. When material is late, nobody knows which job is held up.
- Vague descriptions. "Angle, 20 m" has no size or grade. Use the item code from the BOM.
- One need split across many indents. Small indents slip under the approval limit and hide the real spend.
- Late indents, left pending. Review approved indents with no PO every week.
Types of indent, indent books and pending indents
Types of indent: store and purchase are the two main types. Some manufacturers also mark urgent indents, or keep a capital indent for machines and tools.
Indent book: a bound book of numbered indent slips, usually in duplicate. The fields match this sheet.
Pending indent: approved but not yet issued or turned into a PO. Filter the Status/PO no column for "Approved" to see them. In the Excel example, the castor line is pending.
Don't be the bottleneck. Become the AI-Run Factory.