What are quality control tools?
Quality control tools are the seven simple charts factories use to find, measure and fix defects. They are the check sheet, Pareto chart, cause-and-effect (fishbone) diagram, histogram, scatter diagram, control chart and stratification. Some lists use a flowchart or run chart in place of stratification. In a factory, you count defects on a check sheet and use a Pareto chart to pick the biggest one. Then a fishbone finds its cause, and a control chart checks that the fix holds.
Kaoru Ishikawa, a Japanese quality expert, is credited with grouping these seven tools. He chose them so shop-floor teams could solve most quality problems without advanced statistics.
A quality tool is any simple method that turns inspection data into a decision. These seven need only a pen, squared paper or Excel.
The 7 QC tools, one by one
1. Check sheet: how often does each defect happen?
A check sheet is a printed form where the inspector puts a tally mark each time a defect appears. In a plastic moulding unit, it lists short shots, flash, sink marks and burn marks, one column per shift. Use it first: every other tool needs its counts.
2. Pareto chart: which few defects cause most rejections?
A Pareto chart is a bar chart of defect counts, sorted from largest to smallest, with a running-total line. It usually shows that two or three defects cause most rejections. Use it to decide what to fix first.
3. Cause-and-effect (fishbone): why does this defect happen?
The fishbone diagram puts the defect at the head and possible causes on the bones. The usual bones are man, machine, material, method, measurement and environment. Draw it with the operator, setter and quality in-charge, before anyone blames one cause.
4. Histogram: is the dimension centred and within tolerance?
A histogram groups measurements into ranges and shows how many fall in each. Say you measure 50 shafts from one lot against a 20.00 ± 0.05 mm tolerance. The shape shows whether the lot sits in the middle or leans towards a limit.
5. Scatter diagram: does one factor drive another?
A scatter diagram plots one factor against another, one dot per reading. For example, plot barrel temperature against short shots per hour on a moulding machine. If short shots fall as temperature rises, the two are linked, but a trial still has to prove it.
6. Control chart: is the process stable or drifting?
A control chart plots a measure over time, with a centre line and upper and lower control limits. The limits come from your own process data, usually the average plus or minus three standard deviations.
In plain words, points inside the limits are normal variation. A point outside, or a long run on one side, means something changed.
7. Stratification (or flowchart / run chart): split the data
Stratification means splitting the same data by supplier, machine, shift or batch. A rejection rate that looks normal overall may come mostly from one supplier's lot or the night shift.
Lists differ on the seventh tool. Most use stratification. Some swap in a flowchart or run chart, because stratification is a way of sorting data, not a chart of its own.
Where the data comes from
Every tool above is only as good as the inspection record behind it. A count with no batch, supplier or machine can't be split or traced.
What each inspection record should capture
Date and shift
Batch or lot number
Supplier, machine or operator
Quantity checked, accepted and rejected
Defect type and count
A paper register works for one line, but sorting it by batch or supplier later is slow. Excel sorts well, but copies multiply and entries get skipped when the floor is busy.
Incoming checks belong at the GRN, so rejects trace back to a supplier and feed your vendor rating. Recording the batch number makes complaints traceable too; see batch tracking.
How TranZact helps a manufacturer keep quality records
TranZact is manufacturing AI software used by 10,000+ manufacturers. AI runs your entire operations from enquiry to dispatch, and your team manages it.
Raw material and finished goods quality control are part of the Dominate plan: ₹30,000 a month billed yearly, for 12 users. Batch-wise stock tracking starts at Scale+. See pricing for every plan.
Quality records sit in the same system as the rest of your flow. Purchase runs MRP report → indent → RFQ → PO → GRN → payment, and incoming inspection sits at the GRN. Production covers multi-level BOMs, work orders, process routing, sub-contracting and production costing. Accounting stays in Tally, Busy or Zoho Books, with one-way sync and no double entry.
Know the limits. Quality control is not in Grow or Scale+. TranZact doesn't draw Pareto charts, control charts, histograms or fishbone diagrams. Build those in Excel or Google Sheets, which TranZact integrates with. Software records the checks; it doesn't replace your inspector or these tools.
Which tool to use when
A factory inspects at three stages: incoming material at the GRN, in-process on the line, and final before dispatch. The table matches each tool to its question and stage.
Tool | Question it answers | Where it helps most |
|---|---|---|
Check sheet | How often does each defect happen? | Incoming, in-process and final |
Pareto chart | Which defects matter most? | In-process and final rejections |
Fishbone | Why does this defect happen? | In-process problem-solving |
Histogram | Is the dimension within tolerance? | Incoming lots and in-process |
Scatter diagram | Does one factor drive another? | In-process machine settings |
Control chart | Is the process stable? | In-process, after a fix |
Stratification | Is it one supplier, machine or shift? | Incoming (by supplier) and in-process |
For a small team, start with the check sheet and Pareto chart. They need only counting, and they show where to spend the rest of your effort. Our quality inspection guide covers how to run each stage.
Using the 7 tools together: a worked example
Take a plastic moulding unit making caps for a packaging customer. The numbers below are illustrative, not from a real plant.
The QC tools in order on one defect
Count defects on a check sheet
Pick the top defect with Pareto
List causes on a fishbone
Test causes with stratification or scatter
Confirm the fix on a control chart
Count. Over two weeks, inspectors log 400 rejected caps on a check sheet. The split is 180 short shots, 110 flash, 50 sink marks, 30 burn marks and 30 others.
Pick. The Pareto chart shows short shots and flash make up 290 of 400 rejects, about 72%. The team starts with short shots.
Find causes. The fishbone lists suspects: wet granules, low barrel temperature, wrong injection pressure and setting changes between shifts.
Test. Stratification by shift shows most short shots come from the night shift. A scatter diagram links them to barrel temperatures set below standard.
Fix and hold. The setter locks the temperature in the work instruction for every shift. A daily control chart of short shots then shows whether the fix holds.
Start with one defect
Pick your biggest rejection this month and run it through a check sheet and a Pareto chart. If clean records by batch, supplier and shift are the hard part, we'll show you how TranZact keeps them. For a fuller buyer checklist, read our quality control software buying guide.