Supply Chain Management: Steps for Indian Manufacturers
6 min read
By
TranZact Solutions Team
· Published


Supply chain management (SCM) means planning and controlling how materials, information and money move. It runs from buying raw material to delivering the finished product and handling returns. It has five stages: plan, source, make, deliver and return. For a manufacturer, good SCM means material arrives before production needs it, stock stays lean, and orders ship on time.
What is supply chain management?
IBM describes SCM as coordinating the whole production flow, from sourcing raw material to delivering the finished product. That flow runs across suppliers, manufacturers, distributors, retailers and customers.
The SCM full form is supply chain management. The supply chain is the chain of businesses and steps. SCM is the work of running that chain well.
The 5 stages of supply chain management
The widely used SCOR model splits the supply chain into five stages. Here is each one with a manufacturing example.
1. Plan
Decide what to make, what material you need, and when. Example: a customer order tells you how much MS sheet to arrange.
2. Source
Pick suppliers, raise purchase orders and receive material. Example: a PO for MS sheet, then a GRN when it arrives.
3. Make
Turn material into finished goods, in-house or at a job worker. Example: cutting in-house, powder coating at a job worker.
4. Deliver
Pack, invoice and ship the order. Example: dispatch raises the GST invoice and e-way bill, then the truck leaves.
5. Return
Handle goods that come back from customers or go back to suppliers. Example: a customer sends back defective parts for rework.
Supply chain management diagram for a factory
A supply chain management diagram shows how material moves and which document goes with each step. For a manufacturer, it looks like this.
Factory supply chain: each step and its document
Supplier sends material against a PO
Stores checks it in with a GRN
Production draws stock on an issue slip
Work order turns material into finished goods
Dispatch ships with invoice and e-way bill
Returns run the other way.
Supply chain management in a manufacturing company: an example
This is an illustration, not a real customer. Take a 40-person engineering-goods manufacturer that makes motor brackets.
A customer sends an order for 2,000 brackets.
The BOM shows each bracket needs MS sheet, two bolts and powder coating.
An MRP run checks this against stock and finds a sheet shortfall.
The procurement process starts. Stores raises an indent, and purchase sends an RFQ to three vendors.
Purchase raises a PO on the best quote. The sheet arrives, and stores books a GRN.
Cutting and bending happen in-house. Powder coating goes to a job worker under a delivery challan.
Coated brackets come back and get packed. Dispatch raises the e-invoice and e-way bill.
Payment is followed up, and the entries reach Tally for accounts.
If the BOM is wrong, MRP misses the shortfall. If the GRN is late, stock looks short when it isn't.
Where the supply chain breaks in Indian MSMEs
Most breaks don't start with suppliers. They happen in-house, between registers, Excel and WhatsApp.
Records that don't match. The stock register says one number and the Excel sheet says another. Here is why physical and system stock differ.
Buying from memory. Purchase orders what ran short last month, not what this month's orders need.
Orders on WhatsApp. A changed quantity sits in a chat and never reaches the plan.
Job work material goes missing. Nobody knows how much material sits with each job worker. That also makes ITC-04 filing painful.
Dispatch apart from stock. Invoices and e-way bills are made in one place, while stock lives in another.
The fault sits with the tools, not the team. Registers and spreadsheets were never built to connect these steps.
The patchwork vs one connected system
Registers, Excel, WhatsApp | One connected system | |
|---|---|---|
Stock count | Register and sheet differ | System and physical stock match |
What to buy | Decided from memory | MRP report from orders and BOMs |
Job work | Tracked on paper | Tracked under sub-contracting |
Dispatch papers | Made apart from stock | E-way bill from the GST invoice |
How TranZact runs the factory side of the supply chain
TranZact is manufacturing AI software used by 10,000+ manufacturers. AI runs your entire operations from enquiry to dispatch, on one system. It goes live in 2–3 weeks.
Stage | What TranZact covers |
|---|---|
Plan | MRP report and indent. The MRP engine runs through your orders and BOMs, then tells you what to buy and when. |
Source | Indent → RFQ → PO → GRN → payment, plus vendor coordination |
Make | Multi-level BOM, work orders, process routing, sub-contracting, production costing |
Inventory | Stock in, bin card, issue, multi-store, reorder, AI stock alerts |
Deliver | Dispatch, e-invoicing, e-way bill from the GST invoice, payment |
Accounts stay in Tally. Operations run in TranZact, with a one-way sync and no double entry. See how the Tally sync works.
The purchase management page shows the full buying flow. Check which plan includes each feature on the pricing page.
An honest limit: TranZact covers sales, purchase, inventory, production and planning. It is not a transport, freight or fleet-tracking tool. For that side, read our guides on logistics management and dispatch planning.
Why supply chain management is important for a factory
Fewer stock-outs. Material is bought before production needs it, so lines don't stop.
Less excess stock. You buy what orders need, not what memory suggests.
On-time dispatch. Promised dates rest on real stock, not guesses.
Cash freed up. Less money sits in slow stock on the shelf.
Key components of supply chain management
Lists of "7 key components" vary. IBM names six, and they cover the same ground. For a manufacturer, they mean this:
Component | What it means in a factory |
|---|---|
Planning | Working out material needs from orders and BOMs |
Sourcing | Choosing vendors, raising POs, receiving material |
Manufacturing | Work orders, routing, in-house work and job work |
Inventory management | Knowing what sits in each store, right now |
Delivery | Dispatch, GST invoice, e-way bill, payment follow-up |
Returns | Customer rejections, rework, purchase returns |
The 7 C's of supply chain management
There is no single standard list of the 7 C's. One academic version uses these, shown here with a manufacturing meaning:
Connect: link suppliers, stores, shop floor and customers on shared data.
Create: make products customers value.
Customise: fit the flow to each customer's order and terms.
Coordinate: keep purchase, production and dispatch on one plan.
Consolidate: combine orders and loads to cut waste.
Collaborate: work openly with vendors and job workers.
Contribute: add value at each step, for you and your partners.
What is reverse supply chain management?
Reverse supply chain management handles goods moving back up the chain. That covers customer returns, rework, defective parts and excess stock. IBM calls this stage "returns".
Example: a customer rejects 20 brackets for a coating defect. They come back to stores, go out for rework, then ship again. Each move must show in stock, or the count drifts.
Don't be the bottleneck. Become the AI-Run Factory.
Want to see your own order, BOM, purchase and dispatch flow in one place? Book a demo and walk through it with our team.




