Bill of Material (BOM): Meaning, Types, Format & Example

7 min read

By

TranZact Solutions Team

· Published

Hero Background
Functions of ERP System Explained

A bill of material (BOM) is the complete list of raw materials, parts and sub-assemblies needed to make one unit of a finished product. It also gives the quantity of each. Think of it as the product's recipe. The finished item sits at the top, and every part it needs sits below it, level by level. Factories use the BOM to work out what to buy, what to issue to the shop floor and what each unit costs.

What is a bill of material?

BOM is the short form of bill of materials. "Bill of material" and "bill of materials" mean the same document.

Every BOM has parent and child items. The parent is what you make, and the children are what go into it. The finished product is Level 0. Its direct parts are Level 1, and their parts are Level 2.

What a bill of material contains

A working BOM for an Indian factory usually has these columns:

  • Level: where the item sits in the tree (0, 1, 2 and so on).

  • Item code and item name: one code per item, used the same way by stores and purchase.

  • Description: grade, size or drawing number.

  • Quantity per parent: how many are needed for one unit of the item directly above.

  • Unit of measure (UOM): Nos, kg, metre or litre.

  • Make or buy: whether you produce the item or purchase it.

  • Scrap or wastage %: the real loss in cutting, moulding or machining.

  • Revision: the version number of the BOM.

  • Notes: anything the shop floor must know.

Bill of material example for an engineering product

Here is a simple multi-level BOM for a small water pump. The quantities are illustrative, not taken from a real product.

Level

Item

Qty per parent

UOM

0

Water pump, 0.5 HP

1

Nos

1

Motor assembly

1

Nos

2

Stator core

1

Nos

2

Copper winding wire

0.4

kg

2

Rotor with shaft

1

Nos

2

Ball bearing

2

Nos

1

Pump casing

1

Nos

1

Impeller

1

Nos

1

Mechanical seal

1

Nos

1

Hex bolt M6

8

Nos

1

Primer paint

0.05

litre

1

Carton box

1

Nos

The motor assembly is a sub-assembly with its own Level 2 parts. If you also sell the motor on its own, the same motor BOM serves both products.

Where a BOM breaks in Excel

Excel works for a few products with simple BOMs. It starts to break once products share parts and sub-assemblies.

  • Sub-assemblies copied across sheets. Change the motor in one sheet, and three others still show the old one.

  • Shared parts. One bearing goes into ten products, so nobody sees its total demand.

  • Wastage not recorded. Stores issues more than the BOM says, and stock stops matching.

  • Old revisions in use. The floor builds from a printout two versions old.

  • Buy list worked out by hand. Purchase multiplies orders by BOMs in a separate sheet, every week.

None of this is the team's fault. A spreadsheet was never built to connect a BOM to orders, stock and purchase.

How TranZact uses your bill of material

TranZact is manufacturing AI software, trusted by 10,000+ manufacturers. Its production module covers multi-level BOM, work orders, process routing, sub-contracting and production costing.

The BOM then feeds planning. The MRP engine runs through your orders and BOMs, then tells you what to buy and when. Inventory adds stock in, issue, multi-store, reorder and AI stock alerts.

From BOM to purchase in TranZact
  1. Sales orders and multi-level BOMs

  2. MRP report: what to buy, when

  3. Indent from the MRP report

  4. RFQ and purchase order

  5. GRN when material arrives

Accounting stays in Tally. Operations run in TranZact, with a one-way sync and no double entry. Zoho Books sync works too, and teams go live in 2–3 weeks.

Multi-step BOM and production, MRP and indent are in the Grow plan and every plan above it. Some review pages call TranZact quote-based. It is not: plan prices are on our pricing page, and only Enterprise is custom.

One honest limit: TranZact is not a CAD or PLM tool. Your design team keeps its own drawing software. To compare BOM tools side by side, see our BOM software guide.

Book a demo →

Types of bill of materials

Most factory owners need one type: the manufacturing BOM, usually multi-level. The other names describe the same product at a different stage or for a different job.

By stage: engineering, manufacturing, sales and service

An engineering BOM (EBOM) is the product as designed, often built from drawings. A manufacturing BOM (MBOM) is the product as built, with packing, consumables and wastage added. A sales BOM lists what a customer receives in a kit. A service BOM lists the spare parts used in repairs.

By structure: single-level vs multi-level (indented)

A single-level BOM lists only the direct parts of one item. A multi-level BOM, also called an indented BOM, shows every level down to raw material.

Single-level vs multi-level BOM


Single-level BOM

Multi-level BOM

Shows

Direct parts only

Every level to raw material

Sub-assemblies

Listed as one line

Broken into their own parts

Shared parts

Repeated in each BOM

Defined once, used everywhere

Fits

Simple assembled products

Products with sub-assemblies

Other terms: configurable, phantom and software BOM

A configurable BOM covers a product sold in many options, like different pump sizes. A phantom BOM is a sub-assembly that is built and used at once, never stocked. A software BOM (SBOM) lists the code components inside an app. It has nothing to do with a factory BOM.

How to make a bill of material in 7 steps

  1. Define the product. Fix the exact model, size and variant this BOM is for.

  2. Break it into sub-assemblies. List what gets built separately before final assembly.

  3. List every part and raw material. Include fasteners, consumables and packing used on every unit.

  4. Add quantity per parent and UOM. Each quantity is for one unit of the item directly above.

  5. Mark make or buy. Purchase needs to know which lines to order. Flag parts sent out for job work too, as our subcontracting guide explains.

  6. Add real wastage. Use what the floor actually loses, not a guess from years ago.

  7. Review it, then version it. Check it with production and purchase, then give it a revision number.

To start in Excel, download our free bill of materials format.

BOM vs routing vs work order vs MRP vs BOQ

These terms often get mixed up. Each one answers a different question.

Term

What it is

Who uses it

Question it answers

BOM

Materials and parts for one unit

Design, production, purchase

What goes into the product?

Routing

Sequence of operations and machines

Production

In what steps is it made?

Work order

Instruction to make a set quantity

Shop floor, stores

What do we make now, and how many?

MRP

Plan built from orders, BOMs and stock

Purchase, planning

What do we buy, and when?

BOQ

Work items and quantities for a project

Contractors, project buyers

What does this project need?

For more terms like these, see our manufacturing ERP glossary. For the planning side, read the MRP software buying guide.

Questions people ask about bills of material

What is the difference between BOM and BOQ?

A BOM lists what goes into one manufactured product. A BOQ (bill of quantities) lists work items and quantities for a project, like a building or an installation. Manufacturers use BOMs, and contractors use BOQs.

Can a BOM include labour cost?

A BOM itself lists materials. Labour and machine time usually sit in the routing, and costing adds both to the material cost. Our guide to production costs covers direct and indirect costs.

What are the advantages of using a BOM?

A BOM gives purchase one buying list, stores one issue list and accounts one cost basis. It also shows missing parts before production starts, not halfway through.

See your own BOM in TranZact

Bring one real product to the call, and we'll show its multi-level BOM and MRP report. Don't be the bottleneck. Become the AI-Run Factory.

Book a demo →

Check out other blogs

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders