Make to Stock (MTS): How It Works in a Factory (India)

6 min read

By

TranZact Solutions Team

· Published

Hero Background
Functions of ERP System Explained

Make to stock (MTS) is a way of running a factory where you make goods before customers order them, based on a sales forecast. You keep them as finished-goods stock. Orders ship straight from stock, so delivery is fast, but you carry the cost and risk of stock that doesn't sell. It suits standard products with steady demand; custom products usually suit make to order (MTO).

This guide shows how MTS runs day to day in an Indian factory, where it fits, and how to stop stock from piling up.

What is make to stock?

A make-to-stock strategy starts production before, and separately from, customer orders. You plan from a forecast of what will sell. It is also called build to stock.

MTS is a "push" system. You plan forward from raw material to finished goods, then push them into stock. Make to order is a "pull" system, where the customer order starts the work. For all the main strategies in one place, see our guide to manufacturing strategies.

How make to stock works, step by step

  1. Forecast demand. Estimate monthly sales for each product from past sales and seasonal patterns.

  2. Set stock levels. Fix a minimum, a reorder level and safety stock for each finished item. These tell you when to make more.

  3. Plan production. Turn the forecast into a master production schedule. The bill of materials (BOM) shows what each unit needs.

  4. Buy raw material. Use material requirement planning (MRP) to work out what to buy. Then raise the indent, PO and GRN.

  5. Produce into stock. Finished goods go into the store, not to a waiting customer.

  6. Ship from stock. When an order arrives, you invoice and dispatch from what's on the shelf.

  7. Review monthly. Compare actual sales with the forecast. Reset stock levels for items that sold faster or slower.

How TranZact runs make to stock for a manufacturer

Under MTS, the hard part is keeping stock levels, BOMs and buying in step. With Tally, Excel and WhatsApp, someone has to connect them by hand. TranZact's manufacturing AI software keeps them on one system.

Running make to stock: by hand vs TranZact


By hand

In TranZact

When to make more

Someone checks the stock sheet

Reorder level and AI stock alerts

Raw material to buy

Worked out from BOMs in Excel

MRP report, then indent and PO

Old finished stock

Found during a stock count

Inventory ageing and valuation

Dispatch papers

Typed up separately

E-way bill from the GST invoice

Stock. In TranZact's inventory module, each finished item gets a reorder level, backed by AI stock alerts. Multi-store tracking covers stock across your stores.

Production. Production runs on multi-level BOMs and work orders, with production costing.

Buying. The MRP engine runs through your orders and BOMs, then tells you what to buy and when. The purchase flow then moves from indent to RFQ, PO and GRN.

Ageing and dispatch. Inventory ageing and valuation show which finished goods are sitting too long. TranZact generates the e-way bill from the GST invoice, with e-invoice (IRN) in the same flow.

Accounts. Accounts stay in Tally, Busy or Zoho Books through a one-way sync, with no double entry.

One limit: TranZact doesn't decide whether a product should be MTS or MTO. That's a business call. MRP, multi-step BOM, production costing and inventory ageing are in the Grow plan and above (see pricing).

TranZact is built on 7 years of learning from 10,000+ manufacturers. Live in 2–3 weeks.

Book a demo →

Make to stock examples in Indian factories

These product types often suit MTS. The spec is fixed and buyers reorder often.

  • Standard corrugated boxes in common sizes that many buyers order again and again.

  • Plastic moulded containers and caps made in long runs on the same mould.

  • Standard aftermarket auto spares, where dealers expect parts off the shelf.

  • Packaged food with steady demand, planned around shelf life.

  • Standard chemical grades in common pack sizes.

Now take a printed carton made to one brand's artwork. Nobody else can use it, so it is made only after the order. That's make to order.

MTS vs MTO vs ATO vs ETO

The four strategies differ in when production starts. Here's how they compare.

Strategy

Production starts

Delivery

Best for

MTS (make to stock)

Before the order, from a forecast

Fastest, from stock

Standard products, steady demand

MTO (make to order)

After the order

Slower, waits for production

Custom specs, irregular demand

ATO (assemble to order)

Parts made ahead, assembly after the order

Fairly fast

Products built from standard parts with options

ETO (engineer to order)

After design work for that order

Slowest

One-off machines and projects

MTS holds the most finished stock and offers the least customisation. Read more on assemble to order and engineer to order.

Pros and cons of make to stock

Pros

  • Fast delivery, because orders ship from stock.

  • Steady production runs and better use of machines and labour.

  • Fixed costs spread over more units.

Cons

  • A wrong forecast means overstock or stock-outs.

  • Cash and floor space sit in finished goods.

  • Stock can age, spoil or go out of date.

  • Work-in-progress tends to run high.

  • Shortages cost overtime, rush buying and missed delivery dates.

Does make to stock fit your product?

Run each product line through six yes-or-no checks.

Six checks before you make a product to stock
  • Spec is standard, not custom

  • Same buyers reorder it often

  • Monthly demand is fairly predictable

  • It doesn't spoil or date fast

  • Buyers expect delivery from stock

  • You can afford to hold stock

Mostly yes means MTS. Mostly no means make to order. Most factories run both, product line by product line.

There's a middle path too. Make common parts to stock, then finish them after the order arrives. This is called delayed differentiation, and it is how assemble to order works.

How to avoid overstock and stock-outs under MTS

  • Set levels per item. Give every finished item its own reorder level and safety stock, not one rule for all.

  • Watch ageing. Clear slow movers early, before they become dead stock. Our guide to slow-moving inventory shows how.

  • Review the forecast monthly. Cut targets for items selling below plan.

  • Tie buying to the plan. Buy raw material against the production schedule, not habit.

  • Count regularly. Cycle counting catches gaps between system stock and the shelf.

Terms you'll meet when planning MTS

EOQ and ROP. Economic order quantity (EOQ) is the order size that keeps ordering cost plus holding cost lowest. Reorder point (ROP) is the stock level at which you reorder. See our EOQ guide.

SKU and KPI. A SKU (stock keeping unit) is one unique stock item or variant. A KPI is a number you track, such as stock-outs, days of stock or inventory turnover.

STO vs PO. A stock transfer order (STO) moves stock between your own stores or plants. A purchase order (PO) buys from a vendor.

If your standard products run on forecasts, stock levels and BOMs, see how TranZact keeps them on one system. Don't be the bottleneck. Become the AI-Run Factory.

Book a demo →

Check out other blogs

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders