Preventive Maintenance: Meaning, Types & Schedule
7 min read
By
TranZact Solutions Team
· Published


Preventive maintenance is servicing a machine on a fixed schedule, by date or by running hours, before it breaks down. It covers routine work like cleaning, oiling, inspecting, calibrating and replacing worn parts. In a factory, it keeps critical machines such as CNCs, power presses and compressors running, so orders ship on time.
What is preventive maintenance?
Preventive maintenance means you look after a machine before it fails, not after. The work is planned, written down and done on a set day or after set hours.
PM work is the shop-floor short form. It means the scheduled service tasks on a machine, done by the operator or the maintenance team.
What counts as PM: cleaning, lubrication, inspection, tightening, calibration and replacing parts before they wear out. What does not count: repairing a machine after it has failed. That is breakdown maintenance.
Take a power press. Its clutch, brake and guards are checked on a fixed day. A worn brake lining is found and replaced then, not mid-shift after it fails.
Types of preventive maintenance
Time-based: service by the calendar. It fits equipment that ages whether it runs or not, like boilers and safety valves.
Usage-based: service after set running hours, strokes or cycles. It fits presses, compressors and injection moulding machines.
Condition-based: service when a check shows a problem, like low oil, a worn belt or odd noise. It fits machines checked every shift.
Predictive: sensors read vibration, heat or oil quality and flag wear early. It fits costly machines, but needs sensors and data.
Most manufacturers start with time-based and usage-based schedules. Both are simple to run with a sheet and the maker's manual.
Put a machine on a PM schedule if it:
Stops a customer order when it stops
Has no backup or quick swap
Is safety equipment, like a boiler
Costs more to repair than to service
Has failed more than once
How to set up preventive maintenance in your factory, step by step
List your machines and mark the critical ones. A critical machine is one that stops a customer order when it stops.
Write a checklist for each machine. Start from the maker's manual. Add what your operators already know about it.
Set the trigger. Pick a date, or running hours, strokes or cycles, for each task.
Keep the spares in stock. Each task needs its filters, belts, bearings, seals or oil ready. Set a reorder level and a minimum stock level for each.
Block the service stop in the production plan. Put it in your production plan on a day with slack. Leave room for it in capacity planning.
Record every job. Note whether it was done, late or skipped, who did it and how long it took.
Review repeat failures every month. A machine that keeps failing needs a shorter interval or a better checklist.
Sample PM checklist for common factory machines
These are tasks only. Take each interval from the maker's manual.
CNC / VMC: clean chips and the coolant tank; check coolant and lube oil levels; listen for spindle noise or heat; check air pressure.
Power press: test the clutch, brake and emergency stop; lubricate the slide and gibs; check flywheel belt tension; check guards and die clamps.
Injection moulding machine: check hydraulic oil level and filter; check heater bands and thermocouples; grease the toggle and tie bars; test the safety gate.
Air compressor: drain condensate; check the oil level; clean or change the air filter; check belt tension, leaks and the safety valve.
Daily, weekly, monthly and yearly tasks
This is where tasks usually sit. The maker's manual decides the final interval.
Daily: clean the machine, check oil and coolant levels, listen for noise, check guards.
Weekly: grease the points, check belts and filters, look for leaks.
Monthly: tighten bolts, check electrical connections, check gauges.
Yearly: overhaul, replace wear parts, do a full calibration and alignment.
Where TranZact helps with preventive maintenance
PM rarely fails on the checklist. It fails on what sits around it. The spare isn't in the store, the part takes days to buy, or the planner forgot the machine is down.
TranZact is manufacturing AI software, used by 10,000+ manufacturers, that runs your operations from enquiry to dispatch. Here is what it handles around PM:
Spares in stock: track filters, belts, bearings and oil with stock in, issue and bin cards across multiple stores. Set a reorder level, and AI stock alerts warn you before a spare runs out.
Buying the part: your team moves from indent to RFQ, PO and GRN in one purchase flow. Accounts sync one way to Tally, with no double entry.
The service stop: work orders and process routing show which jobs sit on a machine. So you can move them around a planned stop.
Service day: before and after
Excel + WhatsApp | With TranZact | |
|---|---|---|
Is the spare in stock? | Call the store and wait | Bin card and multi-store stock |
Spare running low | Found out on service day | AI stock alert |
Buying the part | WhatsApp the vendor | Indent → RFQ → PO → GRN |
Jobs on that machine | In the planner's head | Work orders to re-plan |
A clear limit: TranZact is not a maintenance-scheduling (CMMS) tool. It does not schedule machine services or log maintenance jobs. Plans start at ₹8,333 a month, billed yearly, and you go live in 2–3 weeks. See pricing.
The 7 elements of preventive maintenance
The seven elements are the kinds of work a PM programme covers.
Inspection: look, listen and feel for wear, leaks, heat or noise.
Testing: run checks such as a brake test or a safety valve test.
Servicing: clean, oil, grease and top up fluids.
Calibration: check gauges and instruments against a known standard.
Adjustment: set tension, clearance or pressure back to the maker's value.
Alignment: line up shafts, belts, pulleys and dies so parts wear evenly.
Installation: fit a new part in place of a worn one, before it fails.
Why preventive maintenance matters for a factory
Here are the five big reasons maintenance matters on a shop floor.
Less unplanned downtime. Planned stops replace surprise stops, so delivery dates hold.
Longer machine life. Clean, oiled and aligned machines wear more slowly.
Lower cost than emergency repair. No rush freight, no overtime, and no damage spreading to other parts.
Safer shop floor. Brakes, guards and safety valves get tested before they fail under load.
Planned buying of spares. You buy parts on a plan, not in a panic at a rush price.
The 10% rule and how long PM takes
The 10% rule says a PM job is on time if it is done within 10% of its interval. For a 30-day PM, that means within 3 days of the due date.
Track it with PM compliance: PMs done on time ÷ PMs scheduled × 100. Check it every month for your critical machines.
How long a PM takes depends on the machine and the task. A daily check is short. A yearly overhaul can stop a machine for a full shift or more. Record the actual time for each job, then plan it into the shift.
Preventive vs breakdown vs predictive maintenance
Type | When you act | Best for | Main drawback |
|---|---|---|---|
Preventive | On a fixed schedule of hours or dates | Critical machines like presses and CNCs | Some parts replaced early |
Breakdown | After the machine fails | Cheap, non-critical items | Unplanned downtime |
Predictive | When readings like vibration or heat show wear | Costly machines where a stop hurts most | Needs sensors and data |
Most factories mix all three. Cheap items run to failure, critical machines get a schedule, and the costliest get monitored.
Plan service stops before a breakdown plans them for you
Every machine needs service. What you control is when it happens, whether the spare is ready and whether the jobs move in time. See how TranZact handles the spares, purchase and production plan around each service stop.