Production Order: Meaning, Steps & Format for Factories

6 min read

By

TranZact Solutions Team

· Published

Hero Background
Functions of ERP System Explained

A production order is an instruction inside a factory to make a set quantity of one product by a set date. It names the product, the quantity, the due date, the bill of materials (BOM) to use and the routing steps to follow. It is usually raised after a sales order or a planning run. The shop floor books material issued, output and scrap against its number.

What is a production order?

A production order turns demand into a job the shop floor can run. It says what to make, how many, by when, and from which materials.

It goes by other names: work order, manufacturing order, shop order or job ticket. Most Indian factories say "work order" or "job card". TranZact calls it a work order too.

What a production order contains

A complete production order has two halves. The top half is the plan. The bottom half fills up as work happens.

  • Order number and date: the reference every issue and output entry uses.

  • Product and BOM version: the item to make and the bill of material revision to build from.

  • Quantity and UOM: how many, in Nos, kg or litres.

  • Start and due date: when work begins and when goods must be ready.

  • Materials: each BOM line multiplied by the order quantity.

  • Routing steps: the operations in order, with a machine or work centre for each. See our guide to routing in manufacturing.

  • Linked sales order and status: the customer order it serves, and where the order stands today.

  • Actuals: material issued, good output and scrap, booked as work happens.

Sample production order format

Here is an order for 200 units of the 0.5 HP water pump from our BOM guide. The numbers are illustrative, not from a real factory.

Field

Entry

Order number

PRD-0142

Product

Water pump, 0.5 HP (BOM rev. 3)

Quantity

200 Nos

Start / due date

2 Dec 2026 / 12 Dec 2026

Linked sales order

SO-0388

Routing

Casing painting → pump assembly → testing → packing

Status

Released

Material

Per pump

For 200 pumps

UOM

Motor assembly

1

200

Nos

Pump casing

1

200

Nos

Impeller

1

200

Nos

Mechanical seal

1

200

Nos

Hex bolt M6

8

1,600

Nos

Primer paint

0.05

10

litre

Carton box

1

200

Nos

The motor assembly is a sub-assembly. It often gets its own production order, which must finish first.

How a production order works: 6 steps

  1. Demand arrives. A sales order comes in, or the stock plan shows a product running low.

  2. Check the BOM against stock. Any shortfall goes to purchase as an indent or PO. This is the job of material requirement planning.

  3. Create the order. Fix the product, BOM version, quantity and due date.

  4. Release it to the floor. Release only once material and machine capacity are confirmed.

  5. Issue material and record work. Stores issues material against the order number. Each routing step records output and scrap. Goods between steps are work in process (WIP).

  6. Complete and close. Finished goods go into stock and the order closes. Actual cost is then compared with planned cost.

Check before you release an order
  • Latest BOM version attached

  • All material in stock or ordered

  • Machines and operators are free

  • Due date matches the sales order

  • Routing steps listed

Where production orders break on paper and Excel

A register or WhatsApp message works for a few orders a week. It breaks once orders start to share materials and machines.

  • Orders on WhatsApp. The supervisor gets a message, and nobody else sees the order.

  • Shortfalls found mid-run. Bearings run out on day three, because nobody checked stock against all open orders.

  • No record of issues. Stores hands out material without an order number, so stock stops matching.

  • Unknown WIP. Nobody can say how many pumps sit half-built between steps.

  • Cost known at month end. By then, the next batch has already run at the same loss.

None of this is the team's fault. A register was never built to connect orders, stock and purchase.

Register or Excel vs TranZact


Register or Excel

TranZact

BOM

Copied across sheets

Multi-level BOM

Buy list

Worked out by hand

MRP report: what to buy, when

Job work

Tracked on WhatsApp

Sub-contracting

Order cost

Known at month end

Production costing

Accounts

Re-typed into Tally

One-way sync to Tally

How TranZact handles production orders

TranZact is manufacturing AI software, trusted by 10,000+ manufacturers. Its production module covers multi-level BOM, work orders, process routing, sub-contracting and production costing.

Planning sits on top. The MRP engine runs through your orders and BOMs, then tells you what to buy and when. The purchase flow runs MRP report → indent → RFQ → PO → GRN → payment.

Inventory adds stock in, issue, multi-store, reorder and AI stock alerts. Accounting stays in Tally. Operations run in TranZact, with a one-way sync and no double entry.

Production and MRP are in Grow and every plan above. Live in 2–3 weeks.

Two honest limits. TranZact is not a CAD or PLM tool, so design stays in your drawing software. Machine planning is only in the Dominate plan.

Book a demo →

Production order statuses

Every order moves through a set of statuses. Each one controls what the team can do next.

Status

What it means

What it allows

Planned / Created

Drafted, not yet on the floor

Edit quantity, dates and BOM

Released

Approved for the shop floor

Issue material, start work

In progress

Work has started

Book output and scrap

Completed

Full quantity made

Move finished goods to stock

Closed

Costs settled

Viewing only

Cancelled

Order dropped

Return issued material to stores

Names differ by software. Some systems add statuses like Simulated or Firm Planned. The idea is the same.

Production order vs work order vs planned order vs sales order vs purchase order

Order

What it is

Raised by

Goes to

Production order

Instruction to make a set quantity

Production or planning

Shop floor and stores

Work order

Same thing, in most Indian factories

Production

Shop floor

Planned order

A suggestion from planning, not yet approved

Planner or MRP run

Planner, for review

Sales order

Customer's confirmed order

Sales

Production and dispatch

Purchase order

Order to a supplier for material

Purchase

Supplier

The names get mixed up because each software picks its own. For the buying side, see our purchase order guide.

Questions people ask about production orders

What is the difference between a production order and a work order?

In most Indian factories, there is none: both mean an instruction to make a set quantity.

Who creates a production order?

Usually the production planner or production head. In smaller factories, the owner often raises it once a sales order is confirmed.

What is the difference between a planned order and a production order?

A planned order is a planning-run suggestion that becomes a production order once someone approves it.

What is the difference between a production order and a purchase order?

A production order is internal and tells your shop floor what to make. A purchase order goes to a supplier to buy material.

See a production order run in TranZact

Bring one real product to the call. We'll show its BOM, work order and MRP report. Don't be the bottleneck. Become the AI-Run Factory.

Book a demo →

Check out other blogs

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders