Routing in Manufacturing: Meaning, Steps & Example

6 min read

By

TranZact Solutions Team

· Published

Hero Background
Functions of ERP System Explained

What is routing in manufacturing?

Routing in manufacturing is the planned path a product takes through your factory. It sets which operations happen, in what order, on which machine or work centre, and how long each takes. It is written down in a route sheet and sits next to the bill of materials (BOM). The BOM says what goes into the product; the routing says how it is made. Scheduling, capacity planning and production costing all start from the routing.

Put simply, routing is the "how" and the "in what order" of making a part. In production planning and control (PPC), it is the first step. Routing comes first, then scheduling, dispatching and follow-up.

What goes on a route sheet

A route sheet is one page per part or per order. It travels with the job, so everyone works from the same steps.

It has these columns:

  • Operation number, usually in steps of 10, so you can add a step later.

  • Operation: what is done, such as cutting, drilling or welding.

  • Machine or work centre where it runs.

  • Tools and fixtures needed for the step.

  • Setup time: time to get the machine ready, once per batch.

  • Run time per piece.

  • In-house or job work, with the vendor name for outside steps.

  • Inspection point: where a check happens before the next step.

Many shops combine the operation sheet and the route sheet into one "operation and route sheet".

Routing example: a fabricated steel bracket

Here is an example route sheet for an order of 200 mild steel brackets. The times are illustrative, not a standard. Hours per work centre = setup time + (run time × quantity).

Op

Operation (work centre)

Setup + run per piece

Hours for 200 pcs

10

Shearing (shearing machine)

20 min + 0.5 min

2.0

20

Punching and drilling (power press)

30 min + 1 min

3.8

30

Bending (press brake)

40 min + 1.5 min

5.7

40

Welding (MIG welding bay)

15 min + 3 min

10.3

50

Powder coating (job worker)

Vendor: about 3 days

Outside

60

Final inspection (inspection table)

0.5 min

1.7

70

Packing (packing area)

0.3 min

1.0

Operation 50 is done by a job worker. It uses no machine hours in your shop, but it adds about three days to delivery. Track it like any subcontracting step: what went out, to whom, and when it comes back.

Add up the in-house hours and you get about 24 hours of work across six work centres. Welding is the longest step, so it sets the pace of the order. Multiply each work centre's hours by its machine and labour rate, and you have the conversion cost.

Routing vs BOM

The BOM and the routing are two halves of one product record.


BOM

Routing

Answers

What goes into the product

How it is made, and in what order

Contains

Materials, parts and quantities

Operations, sequence, machines and times

Shape

A tree of parts and sub-assemblies

A numbered list of steps

Drives

Buying, through MRP

Capacity and scheduling

Gives you

Material cost

Conversion cost (machine and labour)

A BOM without routing tells you what to buy, but not when you can deliver. If you are choosing a BOM tool, see our guide to BOM software for manufacturers in India.

Where TranZact handles routing for a manufacturer

TranZact is manufacturing AI software used by 10,000+ manufacturers. In its Production module, process routing sits with multi-level BOM, work orders, sub-contracting and production costing.

The MRP engine runs through your orders and BOMs, then tells you what to buy and when. Where the shop floor still writes on paper, a photo of a paper entry becomes a system entry, with no typing.

Routing and Sub-Contracting are in the Grow plan and every higher plan. Machine planning is a Dominate plan feature.

Book a demo →

Routing vs scheduling

Routing fixes the path and the time each step needs. Scheduling decides when each job runs on each machine, using those times.

Say the bracket order needs 5.7 hours on the press brake. Another order needs 4 hours on the same machine, and the shift is 8 hours. Routing gives you both numbers. Scheduling decides which order goes first and which one moves to the next shift.

Without routing times, scheduling is guesswork. For the capacity side, read our guide to capacity requirements planning.

Where routing sits in production planning
  1. Routing: fix steps, machines and times

  2. Scheduling: decide when each job runs

  3. Dispatching: release work orders to the floor

  4. Follow-up: track progress and fix delays

Types of routing

By production type

In job order production, every order is different, so each one needs its own route sheet. In batch production, the same route sheet repeats with each batch. In mass production, the route sheet is prepared once.

Single-level vs multi-level routing

Single-level routing is one straight list of steps for a simple part. Multi-level routing gives each sub-assembly its own routing, which feeds the final assembly. A control panel with a welded frame and a wired harness needs multi-level routing.

Standard vs alternate routing

The standard routing is the usual path. An alternate routing is the backup: a second machine, or a job-work vendor, when the main machine is down or overloaded.

Routing for job orders vs repeat parts


Job order shop

Repeat parts

Route sheet

New for each order

Made once, then reused

Times

Estimated from similar past jobs

Timed on real runs

Changes

With every order

Only when the process changes

How to set up routing in your factory: 7 steps

  1. Start with the product and its BOM. Know every part and sub-assembly before you plan the work.

  2. Decide make, buy or job work for each step. Mark the steps that go to an outside vendor.

  3. List the operations in order. Number them 10, 20, 30 so you can insert steps later.

  4. Assign a machine or work centre to each step. Name a backup where one exists.

  5. Record setup and run time. Time a few real runs; don't guess. Our guides on cycle time and lead time show how to measure.

  6. Add inspection points and expected scrap. If some pieces usually fail at bending, plan to start a few more.

  7. Review with the shop-floor supervisor. Walk the route on the floor. Update it whenever the process changes.

Advantages of routing

Routing turns guesswork into planned work. The main advantages:

  • Delivery dates from real hours, not guesses.

  • The right machine for every job, with a backup named.

  • A cost per piece you can quote from.

  • Job-work material you can see: what went out and when it returns.

  • Less dependence on one supervisor, because the steps are written down.

Common routing mistakes in small factories

  • Routing lives in the supervisor's head. When he is on leave, jobs wait or go to the wrong machine.

  • Paper route cards get lost or go stale. The card says one thing; the floor does another.

  • No times recorded. Delivery dates become guesses, and the customer hears "next week" twice.

  • Job-work steps left out. Material at the plater or coater becomes invisible until it is late.

  • Routing not linked to costing. Quotes miss real machine hours, and margin leaks on every order.

Don't be the bottleneck. Become the AI-Run Factory. See routing, BOMs and work orders together on a short call with our team.

Book a demo →

Check out other blogs

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders