Multi-level BOM: the short answer

A multi-level BOM (bill of materials) lists everything needed to make a product, level by level. The finished product sits at level 0, its sub-assemblies at level 1, and the parts and raw materials inside each sub-assembly below that. Each sub-assembly has its own BOM, so a change to it flows into every product that uses it. A factory needs one when it makes its own sub-assemblies. Purchase can then work out the total raw material for an order, across every level.

It is also called an indented BOM. Each lower level is indented under its parent, so you can see what goes into what at a glance.

A multi-level BOM example: a monoblock water pump

Here is a simple BOM for a monoblock water pump. The items and quantities are an illustration, not a real product spec.

Level

Item

Make or buy

Qty per parent

0

Monoblock water pump

Make

1 no.

1

Motor assembly

Make

1 no.

2

Stator

Make

1 no.

3

Copper winding wire

Buy

1.5 kg

3

Stator stampings

Buy

1 set

2

Rotor

Buy

1 no.

2

Shaft

Buy

1 no.

2

Bearing

Buy

2 nos.

1

Pump-casing assembly

Make

1 no.

2

Casing casting

Buy

1 no.

2

Impeller

Buy

1 no.

1

Packing kit

Make (phantom)

1 no.

2

Carton

Buy

1 no.

2

User manual

Buy

1 no.

What levels 0, 1 and 2 mean

Level 0 is the product you sell. Level 1 is everything that goes straight into it. Level 2 is what goes into each level 1 item, and so on down.

A branch stops at a bought item. The shaft is bought, so nothing sits below it. The stator is made, so its copper wire and stampings sit at level 3.

What a sub-assembly is

A sub-assembly is a made item that goes into another item. The motor assembly is one: you build it, then fit it into the pump. In your stock records it is a semi-finished good.

Single-level vs multi-level BOM: which one you need

A single-level BOM lists only what goes directly into the product. A multi-level BOM keeps going down until every branch ends in a bought item.

BOM type

What it shows

Use it when

Buying list

Single-level BOM

Direct parts only

You buy every sub-assembly ready-made

Top level only

Multi-level BOM

Every level, down to raw material

You make sub-assemblies in-house

Totals across all levels

The rule is simple. If you only do final assembly of bought parts, single-level is enough. Once you make even one sub-assembly in-house, you need multi-level.

How to make a multi-level BOM in 6 steps

  1. Start with the finished product. This is level 0, in the unit you sell, such as one pump.

  2. List what goes directly into it. These are level 1 items: motor assembly, casing assembly and packing kit.

  3. Mark each line make or buy. Only "make" lines get their own BOM. A bought line ends its branch.

  4. Break each made item down to raw material. Repeat steps 2 and 3 for every made item until each branch ends in a bought item.

  5. Add quantity per parent, unit and expected scrap. Write 2 bearings per motor, not per pump. Add scrap where you lose material, such as wire cut-offs.

  6. Give each item one code and reuse it. The same bearing should carry one code in every product. Start with our free bill of materials format.

From BOM to buying list: BOM explosion and the flattened BOM

BOM explosion is how MRP turns an order into a buying list. It starts at the top and multiplies quantities down through every level.

Take an order for 50 pumps. That needs 50 motor assemblies. Each motor takes 2 bearings, so you need 100 bearings. Each stator takes 1.5 kg of copper wire, so you need 75 kg.

Now subtract stock in hand. If the store holds 30 bearings, purchase buys 70. Do this for every bought line, and you have the buying list.

The flattened (or summarised) BOM is that result: one line per part, with the total quantity for the order. The levels disappear, which is what purchase wants. If one part sits in two sub-assemblies, both quantities add into one line.

For how software does this across many orders, see our MRP software buying guide.

From order to buying list
  1. Take the order quantity

  2. Multiply down every BOM level

  3. Add each part into one line

  4. Subtract stock in hand

  5. Buy the balance

In TranZact, the MRP engine runs through your orders and BOMs, then tells you what to buy and when. Purchase then moves from the MRP report to indent, RFQ, PO and GRN.

Book a demo →

Special cases: phantom items, job work and shared parts

Phantom items

A phantom item is a sub-assembly that is built and used straight away. It is never put into stock. The packing kit in our pump is one: the carton and manual go straight into the box.

Job work

Many manufacturers send a sub-assembly, such as stator winding, to a job worker. The sub-assembly stays at its level in the BOM. The material you send out is still your stock until it comes back.

Under GST, goods sent for job work are reported in Form ITC-04. See our subcontracting guide and the post on ITC-04 job work tracking.

Shared parts

One sub-assembly often goes into many products. The same motor may fit three pump models. Before you change its BOM, check every parent that uses it. This is called a where-used check.

Where Excel BOMs break

Excel works for one product with one level. It starts to break once sub-assemblies repeat across products.

  • The same sub-assembly is copied across sheets. Change one copy and the others go stale.

  • Order totals are worked out by hand, level by level. One missed row means a short purchase.

  • The sheet has no link to stock or purchase. Someone still checks the store and types the buying list.

The fault is the tool, not the planner. A spreadsheet was never built to run purchase.

Excel BOM vs TranZact


BOM in Excel

BOM in TranZact

Sub-assemblies

Copied across sheets

Multi-level BOM

Buying list

Worked out by hand

MRP report

Job work

Tracked by hand

Sub-contracting

Accounts

Typed again in Tally

One-way sync to Tally

How TranZact runs multi-level BOMs for a manufacturer

TranZact AI is manufacturing AI software that runs your entire operation, from enquiry to dispatch. 10,000+ manufacturers use it.

Production covers multi-level BOM, work orders, process routing, sub-contracting and production costing. Planning (MRP + indent) sits alongside, so the BOM feeds purchase.

Accounting stays in Tally. Operations run in TranZact, with a one-way sync and no double entry. See how the Tally integration works. TranZact also syncs with Busy and Zoho Books, and integrates with Excel and Google Sheets.

All of this is on every plan from Grow. Batch-wise stock tracking is on Scale+ and Dominate. Batch Tracking & QC is on Dominate.

One honest limit: TranZact is not a CAD or PLM tool for engineering BOMs. It is built for the production and purchase team members who make and buy against the BOM. You go live in 2–3 weeks.

Still comparing tools? Read how to choose BOM software.

See your own BOM, level by level

Bring one real product and see its multi-level BOM and MRP report. Don't be the bottleneck. Become the AI-Run Factory.

Book a demo →

Check out other blogs

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders

Hero Background
Become the
AI-Run Factory

Born in India. Building for the world.

Built by IIT & IIM founders