Multi Level BOM: Meaning, Example & How to Make One
6 min read
By
TranZact Solutions Team
· Published


Multi-level BOM: the short answer
A multi-level BOM (bill of materials) lists everything needed to make a product, level by level. The finished product sits at level 0, its sub-assemblies at level 1, and the parts and raw materials inside each sub-assembly below that. Each sub-assembly has its own BOM, so a change to it flows into every product that uses it. A factory needs one when it makes its own sub-assemblies. Purchase can then work out the total raw material for an order, across every level.
It is also called an indented BOM. Each lower level is indented under its parent, so you can see what goes into what at a glance.
A multi-level BOM example: a monoblock water pump
Here is a simple BOM for a monoblock water pump. The items and quantities are an illustration, not a real product spec.
Level | Item | Make or buy | Qty per parent |
|---|---|---|---|
0 | Monoblock water pump | Make | 1 no. |
1 | Motor assembly | Make | 1 no. |
2 | Stator | Make | 1 no. |
3 | Copper winding wire | Buy | 1.5 kg |
3 | Stator stampings | Buy | 1 set |
2 | Rotor | Buy | 1 no. |
2 | Shaft | Buy | 1 no. |
2 | Bearing | Buy | 2 nos. |
1 | Pump-casing assembly | Make | 1 no. |
2 | Casing casting | Buy | 1 no. |
2 | Impeller | Buy | 1 no. |
1 | Packing kit | Make (phantom) | 1 no. |
2 | Carton | Buy | 1 no. |
2 | User manual | Buy | 1 no. |
What levels 0, 1 and 2 mean
Level 0 is the product you sell. Level 1 is everything that goes straight into it. Level 2 is what goes into each level 1 item, and so on down.
A branch stops at a bought item. The shaft is bought, so nothing sits below it. The stator is made, so its copper wire and stampings sit at level 3.
What a sub-assembly is
A sub-assembly is a made item that goes into another item. The motor assembly is one: you build it, then fit it into the pump. In your stock records it is a semi-finished good.
Single-level vs multi-level BOM: which one you need
A single-level BOM lists only what goes directly into the product. A multi-level BOM keeps going down until every branch ends in a bought item.
BOM type | What it shows | Use it when | Buying list |
|---|---|---|---|
Single-level BOM | Direct parts only | You buy every sub-assembly ready-made | Top level only |
Multi-level BOM | Every level, down to raw material | You make sub-assemblies in-house | Totals across all levels |
The rule is simple. If you only do final assembly of bought parts, single-level is enough. Once you make even one sub-assembly in-house, you need multi-level.
How to make a multi-level BOM in 6 steps
Start with the finished product. This is level 0, in the unit you sell, such as one pump.
List what goes directly into it. These are level 1 items: motor assembly, casing assembly and packing kit.
Mark each line make or buy. Only "make" lines get their own BOM. A bought line ends its branch.
Break each made item down to raw material. Repeat steps 2 and 3 for every made item until each branch ends in a bought item.
Add quantity per parent, unit and expected scrap. Write 2 bearings per motor, not per pump. Add scrap where you lose material, such as wire cut-offs.
Give each item one code and reuse it. The same bearing should carry one code in every product. Start with our free bill of materials format.
From BOM to buying list: BOM explosion and the flattened BOM
BOM explosion is how MRP turns an order into a buying list. It starts at the top and multiplies quantities down through every level.
Take an order for 50 pumps. That needs 50 motor assemblies. Each motor takes 2 bearings, so you need 100 bearings. Each stator takes 1.5 kg of copper wire, so you need 75 kg.
Now subtract stock in hand. If the store holds 30 bearings, purchase buys 70. Do this for every bought line, and you have the buying list.
The flattened (or summarised) BOM is that result: one line per part, with the total quantity for the order. The levels disappear, which is what purchase wants. If one part sits in two sub-assemblies, both quantities add into one line.
For how software does this across many orders, see our MRP software buying guide.
From order to buying list
Take the order quantity
Multiply down every BOM level
Add each part into one line
Subtract stock in hand
Buy the balance
In TranZact, the MRP engine runs through your orders and BOMs, then tells you what to buy and when. Purchase then moves from the MRP report to indent, RFQ, PO and GRN.
Special cases: phantom items, job work and shared parts
Phantom items
A phantom item is a sub-assembly that is built and used straight away. It is never put into stock. The packing kit in our pump is one: the carton and manual go straight into the box.
Job work
Many manufacturers send a sub-assembly, such as stator winding, to a job worker. The sub-assembly stays at its level in the BOM. The material you send out is still your stock until it comes back.
Under GST, goods sent for job work are reported in Form ITC-04. See our subcontracting guide and the post on ITC-04 job work tracking.
Shared parts
One sub-assembly often goes into many products. The same motor may fit three pump models. Before you change its BOM, check every parent that uses it. This is called a where-used check.
Where Excel BOMs break
Excel works for one product with one level. It starts to break once sub-assemblies repeat across products.
The same sub-assembly is copied across sheets. Change one copy and the others go stale.
Order totals are worked out by hand, level by level. One missed row means a short purchase.
The sheet has no link to stock or purchase. Someone still checks the store and types the buying list.
The fault is the tool, not the planner. A spreadsheet was never built to run purchase.
Excel BOM vs TranZact
BOM in Excel | BOM in TranZact | |
|---|---|---|
Sub-assemblies | Copied across sheets | Multi-level BOM |
Buying list | Worked out by hand | MRP report |
Job work | Tracked by hand | Sub-contracting |
Accounts | Typed again in Tally | One-way sync to Tally |
How TranZact runs multi-level BOMs for a manufacturer
TranZact AI is manufacturing AI software that runs your entire operation, from enquiry to dispatch. 10,000+ manufacturers use it.
Production covers multi-level BOM, work orders, process routing, sub-contracting and production costing. Planning (MRP + indent) sits alongside, so the BOM feeds purchase.
Accounting stays in Tally. Operations run in TranZact, with a one-way sync and no double entry. See how the Tally integration works. TranZact also syncs with Busy and Zoho Books, and integrates with Excel and Google Sheets.
All of this is on every plan from Grow. Batch-wise stock tracking is on Scale+ and Dominate. Batch Tracking & QC is on Dominate.
One honest limit: TranZact is not a CAD or PLM tool for engineering BOMs. It is built for the production and purchase team members who make and buy against the BOM. You go live in 2–3 weeks.
Still comparing tools? Read how to choose BOM software.
See your own BOM, level by level
Bring one real product and see its multi-level BOM and MRP report. Don't be the bottleneck. Become the AI-Run Factory.